Laserfiche WebLink
B. Profile <br />The profile shall include, but not be limited to, the following: <br />1. Original ground (dashed) and design grade (heavy, solid). Both grades are <br />to be plainly labeled. <br />2. For six inch vertical curb and gutter, all design elevations shall be centerline, <br />lip of gutter, or flowline (preferred). For combination of curb, gutter and <br />sidewalk, all design elevations shall be back of sidewalk, lip of gutter, or <br />flowline (preferred). The basis of record drawing information shall be the <br />same as the design (both flowline or both top of curb, etc.). <br />3. Stationing continuous for the entire portion of the roadway shown in the <br />plan view, with the centerline station of all non -single family driveways and <br />all intersecting roadways clearly labeled. <br />4. All existing curbs, gutters, sidewalks and pavement adjacent to the <br />proposed design. Basis for existing grades shall be as -built elevations at <br />intervals not to exceed 25 feet. Previously approved designs are not an <br />acceptable means of establishing existing grades. <br />5. Elevation and location of all existing and new utilities in the immediate <br />vicinity of the construction shall be shown on the plans. <br />6. Station and elevation of all vertical grade breaks, existing (as -built) and <br />proposed. <br />7. Distance and grade between VPI's. <br />8. Vertical curves, when necessary, with VPI, VPC, and VPT, high or low point <br />(if applicable) stations and elevations. All vertical curves shall be labeled <br />with length of curve (L) and K=L/A where A is the algebraic difference in <br />slopes, in percent. <br />9. Profiles for all curb returns (except medians). <br />C. Notes <br />In addition to other notes required in these Standards, the following notes shall appear <br />on the cover sheet of all submittals containing roadway plans. If a cover sheet has not <br />been used, they shall be put on the sheet of the plans containing roadway design <br />criteria. <br />1. Inspection: Construction shall not begin until permits have been issued. If a <br />Department of Public Works site inspector is not available after proper <br />notice of construction activity has been provided, the permittee may <br />commence work in the inspector's absence. However, Kittitas County <br />reserves the right to not accept the improvement if subsequent testing <br />reveals an improper installation. <br />2. Paving shall not start until the mix design is accepted by the County <br />Engineer. <br />3. All stationing is based on centerline of roadways unless otherwise noted. <br />4. All elevations are on USGS DATUM with date. Point monument shall be <br />shown on construction location plans. <br />5. Except where otherwise provided for in these plans and specifications, the <br />most current editions of the WSDOT Standard Specifications and WSDOT <br />Standard Plans shall apply. <br />(Ord. 2015-010, 2015) <br />