My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CDS_Ordinance_2023 NonDocket Amendments_KCC
>
Meetings
>
2023
>
06. June
>
2023-06-20 10:00 AM - Commissioners' Agenda
>
CDS_Ordinance_2023 NonDocket Amendments_KCC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2023 2:23:18 PM
Creation date
6/15/2023 1:54:53 PM
Metadata
Fields
Template:
Meeting
Date
6/20/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Ordinance Adopting the 2023 Non-Docket Docket Amendments to Kittitas County Code
Order
3
Placement
Consent Agenda
Row ID
104780
Type
Ordinance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12.80.140 General conditions and requirements - Design - General. <br />1. The utility shall be responsible for the design of the utility facility being proposed. This <br />responsibility shall include, in addition to the integrity of the proposed utility facility, <br />provisions for public safety during the course of construction, as well as consideration of <br />traffic safety and accident potential for the life of the installation, <br />2. For work requiring application to the county, the county may review and approve the <br />utility's plans with respect to: <br />a. location, <br />b. the manner in which the utility facility is to be installed, <br />c, measures to betaken to preserve safe and free flow of traffic, <br />d. structural integrity of the roadway, bridge, or other structure, <br />e. ease of future road maintenance, and appearance of the roadway. <br />3. Provision shall be made for known or planned expansion of the utility facilities, <br />particularly those located underground or attached to bridges or other structures within <br />the right-of-way. <br />4. Granting of a franchise or permit shall not imply or be construed to mean the county <br />shall be responsible for the design, construction, or operation of the facility or for public <br />safety during the facility's installation, operation, or maintenance. (Ord. 94-18 (part), <br />1994; Ord. 9230 Exh. A § 413, 1992. Formerly 12.20.140). <br />12.80.150 General conditions and requirements - Standards and codes. <br />All utility installations shall be designed in accordance with the standards, codes and regulations <br />applicable to the type of utility. The methods of installation and materials used shall conform to the <br />codes and standards promulgated by government and by the industry. This shall also include any <br />road design standards which the county shall deem necessary to provide adequate protection to the <br />road, its safe operation, appearance and maintenance. (Ord. 94-18 (part), 1994; Ord, 92-30 Exh. A § <br />4C, 1992. Formerly 12.20.150). <br />12.80.160 General conditions and requirements - Adjustment and relocation of existing <br />facilities. <br />1. Existing underground utilities on county road right-of-way may be removed or relocated <br />when road work funded by the county would disturb the existing underground utility. <br />All such removal or relocation shall be at the sole expense of the owning utility and all <br />work must be accomplished by the same permitting process as for new installations. <br />2. Notwithstanding reinforcement or protection otherwise provided, a permit -tee shall be <br />responsible for the security of each existing pipeline and utility within a road <br />construction zone. Where there are unusual utility hazards or where heavy construction <br />equipment will be used, the permittee shall provide adequate temporary protection. In <br />replacing the roadway, the design should give due consideration to the protection of <br />previously existing utilities in the roadway section without sacrificing the geometrics of <br />roadway design. (Ord. 94-18 (part), 1994; Ord. 92-30 Exh, A § 5A, 1992. Formerly <br />12,20.160). <br />12.80.170 Permits - General requirements. <br />For work not authorized by franchise, comprehensive plan, or other agreement, a written permit may <br />be required for occupancy of road right-of-way by all utility facilities, including private lines. No <br />
The URL can be used to link to this page
Your browser does not support the video tag.