When required, the haul route plan must be prepared and submitted to the County <br />Engineer and approved prior to beginning or continuing construction. The haul route <br />plan shall address routing, hours of operation, signing, flagging and daily maintenance. <br />If the contractor's equipment or suppliers fail to use the designated haul route, the <br />County Engineer may prohibit or limit further work on the development until such time <br />as the requirements of the haul route are complied with. <br />D. Haul Route Agreement: <br />When identified as a need by the SEPA review process or by the County Engineer, a haul <br />route agreement shall be obtained by the franchised utility, developer or property <br />owner establishing restoration procedures to be performed upon completion of the <br />haul operation. <br />(Ord. 2015-010, 2015) <br />12.09.060 County Forces and County Contract Road Inspection. <br />Road construction performed by County forces or by contract for the County will be inspected under <br />supervision of the County Engineer. <br />12.09.070 Cali Before You Dig. <br />Developers and contractors are responsible for notification of utilities a minimum of two working <br />days in advance of any excavation, or as required by RCW 19.122. The utility One -Call Center phone <br />number 1-800-424-5555 or 811 should be prominently displayed at the work site. Notifications may <br />also be entered online at www.callbeforeyoudig.arg. (Ord. 2015-010, 2015) <br />Chapter 12.10 <br />TRANSPORTATION CONCURRENCY MANAGEMENT <br />Sections <br />12.10.010 Purpose. <br />12.10.020 Authority. <br />12.10.030 Level of Service Standards. <br />12.10.040 Concurrency Evaluation. <br />12.10.050 Concurrency Determination. <br />12.10.060 Determination of Concurrency Finding. <br />12.10.070 Administrative Reconsideration. <br />12.10.090 Definitions. <br />12.10.010 Purpose. <br />The purpose of this chapter is to ensure that adequate transportation facilities are available or <br />provided concurrent with development, in accordance with the Growth Management Act R( CW <br />36.70A.070) and consistent with WAC 365-195-510 and 365-195-835. No development permit shall <br />be issued except in accordance with this chapter. (Ord. 2011-011, 2011) <br />