NIP TO Job Number: TBD PROJECT LENGTH D.00 <br />CONSTRUCTION DURATION: 2 Weeks <br />SCOPING ESTIMATE $1,264,382 CREA(ED 5/15/2023 By: CC <br />1 SnoPark was contemplated in 2008 off 0 County Road All Seasons Drive, The Smoak was started, but never finished. This cost estimate represents the remaining cost to finish building out the parking area. <br />4alntenance cost is also estimated, but A is sepeate to the construction bost. <br />PREPARATION <br />1 <br />LS 0001 <br />MOBILIZATION <br />10% <br />$80,380 <br />GRADING <br />6,BBg <br />CY 0310 <br />ROADWAY EXCAVATION INLC. HAUL <br />$30,00 <br />$206,667 <br />DRAINAGE <br />2,667 <br />CY 1030 <br />DITCH EXCAVATION INCL. HAUL <br />$20.00 <br />$53.333 <br />6200, <br />TON iWT <br />81N. QUARRY ROCK <br />$5000 <br />$310,000 <br />SURFACING <br />4,244 <br />TON 5100 <br />CURSHED SURFACING BASE COURSE <br />$33.00 <br />$140G37 <br />2,679 <br />TON 5120 <br />CURSHED SURFACING TOP COURSE <br />$3500 <br />$93,765 <br />Data <br />PROJECT CHANGE TRACKING <br />By Commmts <br />BID ITEM SUBTOTAL WIO MOBILIZATION <br />MOBILIZATION 10.00% <br />$803,803 <br />$80.38028 <br />151 2323 <br />¢ Ini one eshowe. No dmgn work has been done <br />BID ITEM SUBTOTAL <br />DESIGN ALLOCATIONS 0.00% <br />$884,183 <br />$0 <br />BID ITEM TOTAL <br />$884183 <br />SALES TAX C 0 00% <br />PROJECTSUBTOTAL <br />CONSTRUCTION ENGINEERING Q 10% <br />$0 <br />$884,183 <br />$88,418 <br />CONTINGENCIES Q 20% <br />ON ESTIMATE <br />PE PHASE 10% <br />FUN ACQUISITION COSTS <br />$176.837 <br />$1,149,438 <br />114,944 <br />$0 <br />PROJECT TOTAL <br />$1,264,382 <br />MaintenenceCoat <br />1 inch CSTC removal from plows/year <br />124000 SF aNected area/year <br />3823 U/year'=400 CY/year <br />400 CY - LA TONS/CY = 560 TON <br />I 35$/TON=$19600 Annua l Maintenance I <br />