Laserfiche WebLink
cosr DETAIL SHEET <br />New U-Bollards & Sleeves PROJECT: Kittitas <br />CONTRACTOR: <br />County Bloom Pavilion Addition <br />Revised 4121123 for bollard & sleeve credit amount <br />iubcontractors: <br />TEM <br />Paid Med ical Leave @ 2.5To (012025 <br />SmallTools @ 5% of Labor <br />&Safety @ <br />l <br />l <br />2o/o of <br />l <br />Labor <br />Contractors Mark Up @ 15Yo <br />Contractors OH & P @ 60/o on Subcontractor <br />General Contractor Subtotal: <br />Subcontractor Subtotal <br />Subtotal: <br />Liability lnsurance 1-7Yo <br />Bonds @ 1 17o/o <br />@ <br />B & O Taxes <br />Concord Constructi on, lnc. <br />-1 1^95 1.95 <br />Subtotal 2,861"66 <br />2 <br />3 <br />4 <br />5 <br />-4 <br />Subtotal <br />Subtotal <br />37.76 <br />2,828 <br />424.23 <br />3,252.43 <br />3,252.43 <br />55"29 <br />38"05 <br />16.26' <br />.000 <br />TOTAL <br />(47B.00) <br />1,480.52 <br />268.25 <br />1,393.00 <br />209.U <br />TOTAL <br />LABOR <br />-478.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Labor <br />0.00 <br />TflATERIAL <br />0.00 <br />1480.52 <br />268.25 <br />1393.00 <br />0.00 <br />MTL <br />0.00 <br />EQUIP <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />209.84 <br />SUB <br />0.00 <br />Labor <br />-478.00 <br />0.00 <br />0"00 <br />0.00 <br />0.00 <br />Labor <br />MTL <br />0.00 <br />370"13 <br />?68.25 <br />199"00 <br />0.00 <br />MTL <br />UNIT COSTS <br />EQUIP <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />209.84 <br />UNIT <br />SUB <br />UNIT <br />ls <br />ea <br />ls <br />ea <br />ls <br />UNIT <br />QTY <br />1 <br />4 <br />1 <br />7 <br />1 <br />U-bollard shipping & handling <br />DESCR <br />of pipeJC <br />sleeves <br />Credit <br />4 on-lards (7 total on <br />site <br />New bo <br />new <br />DESCRIPTION <br />OECOP No. <br />Revised 4"21.23 <br />rugIEI@ <br />Panp 1 <br />@ O 5o/o