Laserfiche WebLink
CD? O+ <br />Ntu, 1NdPrecision Paving & Gradingr lnc. <br />PRECTPG966QH <br />1013 Madison Ave. Yakima, WA 98902 (509) 965-4214 * Fax (509) 965-8842 <br />www. precisionpavinganderadine. com <br />Date: 4/l0l23 Job Name: Kittitas Pavilion Change order <br />Name: Concord Construction Contact: Casey <br />Street:Street: 8557 Lateral B Rd. <br />City: Wapato State: 98951 Citv: Ellensburg State: 98926 <br />Phone Cell: 509-848-3361 Email : casey{Oconcordconstruction. com Fax: <br />We hereby submit specifications and estimate for: Asphalt Paving <br />Work outside of this contract will be pcrformed only with a properly executed change order at a price to be agreed <br />upon at the time the change in work is requested. All work is guaranteed for one full year upon completion. Prices are <br />Our bid includes: <br />5, {95 <br />"fsta I <br />00 <br />$700.00 &applicable tax <br />fi z,lu 5r <br />We will patch 3 areas with 2" compacted V"" HMApg64'28 <br />uCnd* = <br />It,g5+ <br />su ect to cha due to <br />t'f(,P*l* <br />9),*h E,*c tuA <br />h*lrufw <br />xs U <br />*Thank you for this opportunity* <br />Replace sewer line - 2,542 sq. ft <br />$4,785.00 & applicable tax <br />uctincreases in oil <br />g69y1g2:n60 <br />North side: <br />On your grade apply ground sterilant <br />Place 2" compacted ll2" HMA pg64-28 <br />South side - 273 sq. ft, <br />er <br />It is agreed that any controversy arising from this contract will be subject to binding arbitration in Yakima, Washington pursuant to the <br />construction industry arbitration rules of the American Arbitration Association. All material is guaranteed to be as specified. All work to be <br />completed in a workmanlike manner according to standard practices. We hereby propose to fumish labor and material - complete in <br />accordance with the above specifications for the sum of: <br />Dollars: See Above Plus Tax (if applicable) <br />Payment terms 407o down balance upon completionl <br />Any alteration or deviation from above specifications involving exlra costs, will be executed only upon written ordcrs, and will become an <br />extra charge over and above the estimate. Failure or delay to make payment upon completion shall constitute a default and customer <br />promises and agrees to pay a late charge ofone and one halfpercent(l %o/o) per month ofthe amount due; to pay all costs ofcollection, <br />including reasonable attomey's fees, ifplaced in the hands ofan attorney for collection or suit. <br />It is required by Washington State Law (SHB 914) that the Property Owner, Lender, and Bonding Company's name, address and phone <br />number to be posted by the Owner at the job site on commercial projects. Please veri! that this information is posted. <br />Owner shall make sure all underground utilities are below sub-grade. Precision Paving & Grading, lnc. will not assume any damages when <br />our bid includes fine-grade, soil sterilant, crushed rock, and asphalt only. <br />Authorized Signature: D a wwg ThowvTsow <br />Note: This lm be withdrawn us if not within l5 d Bidder: Danny <br />I <br />Acceptance of Proposal <br />The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as <br />specified. Payment willbe made as outlined above. In accordance with RCWI9,16.250 (18) Commercial Accounts. <br />further agree that ifthe account is refened for collection, to pay collection fees <br />not to exceed 35% of the commercial claim. <br />Date:Signature <br />olr