My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALSC Change Order 003 KVEC
>
Meetings
>
2023
>
05. May
>
2023-05-16 10:00 AM - Commissioners' Agenda
>
ALSC Change Order 003 KVEC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2023 9:01:38 AM
Creation date
5/24/2023 9:01:18 AM
Metadata
Fields
Template:
Meeting
Date
5/16/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order No. 003 with Concord Construction, Inc. for the Bloom Pavilion Construction Project
Order
4
Placement
Consent Agenda
Row ID
103113
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.485.00 <br />TOTAL <br />TOTAL <br />720.44 <br />36.386.00 <br />(3.013.00) <br />(1.857.60) <br />07 <br />LABOR <br />0.0c <br />0.0c <br />0.00 <br />Labor <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0-00 <br />0.00 <br />0.00 <br />0.00 <br />MATERIAL <br />0.00 <br />0.00 <br />0.00 <br />MTL <br />0.00 <br />EOUIP <br />0.00 <br />0.00 <br />0.00 <br />SUB <br />720.00 <br />0.00 <br />5485.01 <br />36386.00 <br />-3013-00 <br />-1857.60 <br />Labor <br />Labor <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />MTL <br />MTL <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />N <br />EOUIP <br />UNIT COSTS <br />SUB <br />724 <br />1665 <br />5485 <br />36386 <br />-301 3 <br />-1857.60 <br />dav <br />UNIT <br />UNIT <br />s/c <br />s/c <br />s/c <br />s/c <br />s/c <br />OTY <br />ow <br />1 <br />0 <br />1 <br />1 <br />1 <br />1 <br />Underqround locate services, Utilities Plus <br />Asphalt, Precision Paving <br />DESCRIPTION <br />Re-mobilization for Cattle Wash Walls, PMI <br />Masonry - DELETED <br />Credit storm line section on South end ot <br />addition, Shawn Hyatt Excavatinq, 4118123 <br />DESCRIPTION <br />Sewer Line Replacement, Shawn Hyatt <br />Excavatinq, Revised 4120123 <br />crectfi aspnan patch over souln eno storm llne <br />that is already in place, Precision Paving <br />ITEM <br />ITEM <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />New Sewer Line DCI Plan dated <br />Paid Medical Leave @2.5% (012025)0.00 <br />Subtotal <br />Small Tools @ 5% of Labor <br />lSubtotal <br />;Sublotal <br />i <br />Health & Safety @ !o/o 9f ,La!q1 <br />Contractors rrlari up @ 15w <br />-- -Contraclors . ...1.,._. <br />oH&F@6%on Subcontractor z-zoJ.zz <br />Subtotal 39,983.62 <br />General Contractor Subtotal: <br />Subcontractor Subtotal: <br />Subtotal: <br />I Liaoility tnsurince p t "t"t <br />Bonds @ 1.17To <br />B&OTaxes@0.5% <br />. 679,72 <br />467.81 <br />tgg.gz " <br />41.3J1.Ul <br />()("to+l <br />tFe <br />$s <br />a <br />,un", I g
The URL can be used to link to this page
Your browser does not support the video tag.