Laserfiche WebLink
Job No. 2203 - Bloom Pavilion Addition <br />COP 06 - Haul Unsuitable Soils Off -Site <br />Hyatt Gravel Ticket TN to CY Calculation Summary <br />Up NO <br />4/20/2023 <br />ppit 313 <br />Gravel Hauled to Date <br />Date <br />Tons <br />Conv. Factor <br />Cubic Yards <br />3/20/2023 <br />279.02 <br />1.4 <br />199.30 <br />3/21/2023 <br />386.09 <br />1.4 <br />275.78 <br />3/22/2023 <br />509.09 <br />1.4 <br />363.64 <br />3/23/2023 <br />341.94 <br />1.4 <br />244.24 <br />4/13/2023 <br />223.79 <br />1.4 <br />159.85 <br />4/14/2023 <br />57.09 <br />1.4 <br />40.78 <br />Total CY <br />1283.59 <br />Up NO <br />4/20/2023 <br />ppit 313 <br />