My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 003
>
Meetings
>
2023
>
05. May
>
2023-05-16 10:00 AM - Commissioners' Agenda
>
Change Order No 003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2023 12:12:01 PM
Creation date
5/11/2023 12:10:14 PM
Metadata
Fields
Template:
Meeting
Date
5/16/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order No. 003 with Concord Construction, Inc. for the Bloom Pavilion Construction Project
Order
4
Placement
Consent Agenda
Row ID
103113
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bid No; E508969 Page 1 of 1 <br />coo -v 0-� <br />�YC,w 5tv <br />H.D. FOWLER <br />COMPANY <br />Customer: SHAWN HYATT EXCAVATING INC Estimate: E508969 <br />Estimator: Angel Mendoza Bid Date: 4/20/2023 <br />Job Name: BLOOM PAVILION SEWER REPLACEMENT <br />Location: KITTITAS, WA <br />Line <br />Qty UoM <br />Description <br />Unit Price <br />Extended Price <br />1 <br />504 FT <br />8" SDR35 3034 GASKETED PVC SEWER PIPE 14' LENGTH <br />11.81 <br />5,952.24 <br />2 <br />1 EA <br />8" KOR-N-SEAL BOOT S106-12AW FOR PVC 7.00" - 8.50" O.D RANGE 12" <br />66.67 <br />66.67 <br />CORE HOLE REQUIRED EX SERIES PLASTIC WEDGE STYLE <br />3 <br />1 EA <br />8" PSM STOP COUPLING GASKETED FOR SEWER OR DRAIN <br />86.75 <br />86.75 <br />Approximate Total 6,105.66 <br />6 C05' <br />qj$ <br />
The URL can be used to link to this page
Your browser does not support the video tag.