Laserfiche WebLink
• Providing the required freeboard would cause adverse environmental impacts, roadway geometric <br />impacts, or other unacceptable impacts <br />• Efforts have been made to maximize the freeboard to the extent practicable <br />Approval from the HQ Hydraulics Section does not guarantee that permitting agencies will approve the <br />proposed 100 -year design freeboard. <br />