My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-11-minutes-solid-waste-and-maintenance
>
Meetings
>
2023
>
05. May
>
2023-05-02 10:00 AM - Commissioners' Agenda
>
2023-04-11-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 1:06:51 PM
Creation date
4/27/2023 1:06:03 PM
Metadata
Fields
Template:
Meeting
Date
5/2/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
102562
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/31/2022 <br />Total Cost Comments/Assumptions <br />$13,602 <br />$54,861 Avg depth = 2.5 ft x clearing and grubbing <br />$61,875 275 -ft long x avg 3 ft tall <br />$27,495 includes excavation <br />$10,000 <br />$207,407 SF x 8' depth, includes rock, pipe, fabric, backfill <br />$20,000 <br />$52,439 1.85 tons/cy, 6" CSBC <br />$79,238 2.05 Tons/CY, 3" HMA <br />$12,000 <br />$45,500 <br />$30,000 <br />$15,000 Cameras, attachments, wire, conduit <br />$2,500 <br />$4,800 <br />$45,000 <br />$12,500 <br />$22,500 <br />$6,000 <br />$40,000 <br />$3,000 <br />$25,000 <br />$4,500 <br />$500 <br />$10,000 <br />$64,457 <br />$870,175 <br />$261,052 Planning Level Contingency <br />$101,810 <br />$56,561 <br />$1,290,000 Rounded to the thousands <br />actions to support it. <br />
The URL can be used to link to this page
Your browser does not support the video tag.