Laserfiche WebLink
8/31/2022 <br />Total Cost Comments/Assumptions <br />$13,602 <br />$54,861 Avg depth = 2.5 ft x clearing and grubbing <br />$61,875 275 -ft long x avg 3 ft tall <br />$27,495 includes excavation <br />$10,000 <br />$207,407 SF x 8' depth, includes rock, pipe, fabric, backfill <br />$20,000 <br />$52,439 1.85 tons/cy, 6" CSBC <br />$79,238 2.05 Tons/CY, 3" HMA <br />$12,000 <br />$45,500 <br />$30,000 <br />$15,000 Cameras, attachments, wire, conduit <br />$2,500 <br />$4,800 <br />$45,000 <br />$12,500 <br />$22,500 <br />$6,000 <br />$40,000 <br />$3,000 <br />$25,000 <br />$4,500 <br />$500 <br />$10,000 <br />$64,457 <br />$870,175 <br />$261,052 Planning Level Contingency <br />$101,810 <br />$56,561 <br />$1,290,000 Rounded to the thousands <br />actions to support it. <br />