My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 2023-061
>
Meetings
>
2023
>
04. April
>
2023-04-04 10:00 AM - Commissioners' Agenda
>
RES 2023-061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 12:49:52 PM
Creation date
4/17/2023 12:49:48 PM
Metadata
Fields
Template:
Meeting
Date
4/4/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for Intersection Corridor Safety Improvements, CRP 313-21
Order
28
Placement
Consent Agenda
Row ID
101486
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency <br />Kittitas County Public Works <br />Project Title <br />Intersection Corridor Safety Improvements <br />Date <br />312912023 <br />Right of Way <br />M ruo Right of Way Needed <br />* All construction required by the <br />contract can be accomplished <br />within the existing right of way. <br />Right of Way Needed <br />n f,lo Relocation n Relocation Required <br />Utilities Railroad <br />n ruo utility work required <br />nnt utility work will be completed prior to the start <br />of the construction contract <br />Z rul utility work will be completed in coordination <br />with the construction contract <br />Z tlo railroad work required <br />Erut railroad work will be completed prior to the start of <br />the construction contract <br />Entthe railroad work will be completed in coordination <br />with the construction contract <br />Description of Utility Relocation or Adjustments and Existing Major Structures lnvolved in the Project <br />One location will have a power service disconnected, which will have to happen after the new solar LED <br />signs are installed, and before existing signs with electric components are removed. <br />FM lnvolvement <br />ls any airport located within 3.2 kilometers (2 miles) of the proposed project? f] Ves Z ruo <br />Remarks <br />This project has been reviewed by the legislative body of the administration agency or agencies, or it's <br />designee, and is not inconsistent with the agency's comprehensive plan for.community development. <br />Agency <br />ByDate <br />DOT Form 140-101 <br />Revised 0112022 <br />Mayor/Chairperson <br />Previous Editions Obsolete <br />a l+22 <br />Page 3
The URL can be used to link to this page
Your browser does not support the video tag.