Laserfiche WebLink
Agency <br />Project Title <br />Date <br />Kittitas County Public Works <br />Intersection Corridor Safety Improvements <br />3/29/2023 <br />Right of Way <br />❑✓ No Right of Way Needed <br />❑ Right of Way Needed <br />`AII construction required by the <br />❑ No Relocation ❑ Relocation Required <br />contract can be accomplished <br />within the existing right of way. <br />Utilities <br />Railroad <br />❑ No utility work required <br />0 No railroad work required <br />❑ All utility work will be completed prior to the start <br />❑ AII railroad work will be completed prior to the start of <br />of the construction contract <br />the construction contract <br />OAll utility work will be completed in coordination <br />F-1 All the railroad work will be completed in coordination <br />with the construction contract <br />I with the construction contract <br />Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project <br />One location will have a power service disconnected, which will have to happen after the new solar LED <br />signs are installed, and before existing signs with electric components are removed. <br />FAA Involvement <br />Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes [VI No <br />Remarks <br />This Droiect has been reviewed by the legislative bodv of the administration agencv or agencies, or it's <br />designee, and is not inconsistent with the agency's comprehensive plan for community development. <br />Agency Kittitas County <br />Date By <br />Mayor/Chairperson <br />DOT Form 140-101 Page 3 <br />Revised 01/2022 Previous Editions Obsolete <br />