Laserfiche WebLink
lands are being moved into public ownership by state resource agencies limiting access to <br />these lands by county residents. PW believes the potential for public access to the <br />national forest through Sun East warrants evaluation. Once conditions warrant, PW <br />suggests a route evaluation from our design construction group. PW will then prepare <br />cost estimates and return to the Board for consideration. <br />FISCAL IMPACTS: <br />Undetermined at this time. <br />ATTACHMENTS: <br />EXHIBIT 1: PW COST ESTIMATE ROBBINS ROAD (1.6 MILES) <br />EXHIBIT 2: SUN EAST PLAT MAP <br />Page 2 of 4 <br />Public Works "Work Session StafReport", 2023 <br />