Schedule G: Systems Start -Up and Commissioning <br />Commissioning will be provided during the Interim Period by the ESCO for all new equipment <br />and systems installed except for other measures that do not require commissioning. <br />Commissioning services are detailed in the Section 2: Scope of Work in the ESP dated February <br />17, 2023. <br />ESCO (McKinstry)/OWNER/PERFORMANCE CONTRACT 35 <br />