ESCO's analysis and determination of the most qualified proposal response, at the sole discretion <br />of the ESCO. <br />The Owner shall have the right to stipulate the use of a particular equipment vendor or <br />subcontractor, as long as such stipulation is delivered to the ESCO in writing prior to the final <br />acceptance of the ESP. Should an Owner stipulated equipment supplier or sub -contractor not be <br />able to perform the scope of work or task to the satisfaction of the ESCO, the ESCO shall have the <br />right to engage a separate vendor or sub -contractor to complete the work fourteen (14) days after <br />written notice to the Owner has been delivered and the failure to perform persists. The time for <br />performance, and the GMIC, shall be equitably adjusted. <br />Section 25.16. Bonding Requirements. Contractor shall furnish performance and payment <br />Bonds, each in an amount equal to the Construction Cost. The Bonds shall cover completion of <br />the physical work per the approved design, and shall not guarantee or warranty efficiency or system <br />performance. The Bonds shall not cover any obligation of the contractor to ensure that the work <br />as constructed will result in any particular level of energy savings. Any suit on the Bonds must be <br />brought within the period of one (1) year after substantial completion, as defined in the contract; <br />provided, however, that if this suit limitation is void or prohibited by law, the minimum period of <br />limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. <br />Section 25.17. As -Built Drawings. Where applicable, ESCO must provide durable, <br />reproducible record drawings from the "as -built drawings" of all existing and modified conditions <br />associated with the project, conforming to typical engineering standards. These should include <br />architectural, mechanical, electrical, structural, and control drawings and operating manuals and <br />will be delivered prior to acceptance. <br />Section 25.18. Operation and Maintenance Manuals. Electronic Operation and <br />maintenance manuals will be provided for the Equipment, or parts thereof installed. <br />Section 25.19. Continuing Activities. The Owner reserves the right to make energy and <br />water improvements and control adjustments to the Premises and to monitor the performance of <br />the installations independently of ESCO. Additionally, the Owner may wish to integrate other <br />identified capital needs with ESCO projects, which may or may not contain energy and water <br />savings opportunities. No credit will go to ESCO for these improvements, and the Owner will <br />monitor these savings separately. The Owner will inform the ESCO in writing of the specific <br />changes and alterations. ESCO may readjust the baselines based on the new information and in <br />accordance with Schedule E (Savings Measurement & Calculation Formulae; Methodology to <br />Adjust Baseline). This Section does not abrogate or alter ESCO's right to make baseline <br />adjustments as set forth in Section 15 or elsewhere in this Contract. <br />Section 25.20. Contract Re -Negotiation. The Owner and ESCO reserve the right to <br />renegotiate the terms of the Contract due to changes in the regulatory or utility climates or the non - <br />discretionary use of energy or if the Owner desires to add sites in addition to those identified in <br />the RFQ. ESCO shall consider the Owner's effort at renegotiation in good faith. This Contract, <br />however, shall not be modified without the written agreement of the Owner and the ESCO. <br />ESCO (McKinstry)/OWNER/PERFORMANCE CONTRACT 25 <br />