My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-03-14-minutes-solid-waste-and-maintenance
>
Meetings
>
2023
>
04. April
>
2023-04-04 10:00 AM - Commissioners' Agenda
>
2023-03-14-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2023 12:12:08 PM
Creation date
3/30/2023 12:09:24 PM
Metadata
Fields
Template:
Meeting
Date
4/4/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
101486
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
work. Energy savings generated during the Interim Period will accrue towards the first year <br />Guarantee. <br />ESCO and the Owner agree to work in good faith to resolve any disagreement over the <br />calculation of the energy savings. Should the parties be unable to resolve their disagreement as to <br />the calculation of energy savings, then either party will provide written notice to the other and the <br />parties will then agree that an independent auditor will be engaged to provide a binding decision <br />on whether the calculation of savings or deficiencies, as prepared by ESCO, is fairly stated in <br />accordance with this Contract. If the parties cannot agree upon an auditing firm, then each shall <br />designate a firm, and the two designated firms shall identify a mutually agreeable third firm and <br />such third firm alone shall perform the audit. The independent auditing firm shall include in its <br />report any exceptions determined by its review. Each party agrees to reasonably cooperate with <br />the auditing firm, including, without limitation, delivering to such firm any records, documents or <br />information reasonably requested in electronic format, if available, or otherwise. Any payments <br />between the parties that are necessary to resolve any irregularities identified in the review will be <br />made within sixty (60) days after submission of the review to the parties. If the audit is called by <br />the ESCO or the Owner, the following structure will be applied to paying for the audit: <br />Ifthe independent auditor determines that ESCO's determination of the difference between <br />the annual Energy Savings Guarantee and the amount of the actual energy saving achieved at the <br />Premises was in error in the Owner's favor, ESCO shall pay the entire cost of the audit; however, <br />if ESCO's determination of the Energy Savings Guarantee is not in error or is in error in the <br />ESCO's favor, the Owner shall pay for the entire cost of the audit. In any case, the calculation of <br />energy savings shall be changed to reflect the findings of the audit, and the calculations of savings <br />relating to the Energy Savings Guarantee will be modified to reflect such. <br />SECTION 6. PERMITS AND APPROVALS: COORDINATION <br />Section 6.1. Permits and Approvals. ESCO shall be responsible for timely obtaining all <br />necessary installation/building permits. The Owner shall use its reasonable efforts to assist ESCO <br />in obtaining all necessary installationibuilding permits (operating permits are the responsibility of <br />the Owner) and approvals for installation of the Equipment. The Equipment and the installation <br />and operation of the Equipment by ESCO shall at all times conform to all federal, state and local <br />code requirements. ESCO shall furnish copies of each permit or license, which is required of it to <br />perform the work, to the Owner before ESCO commences the portion of the work requiring such <br />permit or license. <br />ESCO shall pay for plumbing and electrical permits required by the authority having <br />jurisdiction. ESCO shall be reimbursed within the GMIC for all licenses and permits, fees and <br />charges for connections to outside services and for the use of municipal or private property for <br />storage of materials, parking, utility services, temporary obstructions, enclosures, opening and <br />patching of streets, etc., arising from the construction and completion of the installation and <br />maintenance of the Equipment contemplated by this Contract, and as agreed to by ESCO and the <br />Owner. <br />Section 6.2. Coordination During Installation. Owner and ESCO shall cooperate to <br />coordinate the activities of ESCO's equipment installers with the employees and agents of the <br />ESCO (McKinstry)/OWNER/PERFORMANCE CONTRACT 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.