My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-03-13-minutes-public-works-study-session
>
Meetings
>
2023
>
04. April
>
2023-04-04 10:00 AM - Commissioners' Agenda
>
2023-03-13-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2023 12:11:32 PM
Creation date
3/30/2023 12:09:17 PM
Metadata
Fields
Template:
Meeting
Date
4/4/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
101486
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineering <br />Greg Jellison <br />Project Engineer <br />Finance <br />Kahy Jurgens <br />Manager <br />Maintenance <br />Ken Maine <br />Manager <br />Transportation <br />& Trek <br />Safety <br />Page Scott <br />Senior Pier <br />Telephone: <br />(509) <br />952-7623 <br />Fax: <br />( 09) <br />962--7653— <br />"' 4"4"tas Corrin Public Works <br />November 17, 1995 <br />Cruse & Nelson <br />Chuck Cruse <br />P.O. Box 959 <br />Ellensburg, WA 98926 <br />RE: Naneum Road survey <br />Dear Churn: <br />Upon staff review, it has been determined that the physical location of Naneum Road is not <br />concurrent with the pians of record dated 1973 and 1974. Therefore, your firm is authorized <br />to establish the legal right of way of Naneum Road, using the existing centerline with 30 feet <br />on each side totaling a 80' fight of way. This authorization is only for that portion of the road <br />lying in the E 112 of the SE 1/4 of Section 20, 'Township 19 North, Range 19 East and falls <br />within the boundary of the property survey you are performing. Our department will review <br />the legal right of way and field locations with you. The department policy in similar <br />situations has been to create an equitable split of the existing roadway. Your firm will be <br />expected to follow the same policy. <br />Authorization to establish this right of way is for the Naneum Road project only. Other <br />similar situations must be reviewed on a project specific basis. <br />Please advise Fred Dunham of our survey crew when you have completed this for his <br />review. <br />If you have any questions, please contact this department. <br />Sincerely; <br />GREGORY P. JELLISON, P.E. <br />Project Engineer <br />2G5 `rv2St SV., _71 -ow -r_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.