Laserfiche WebLink
2023 Maintenance Rock Materials <br />Bid Opening February 23,2023, at 2:00 p.m. <br />SCHEDULE'B' <br />Vendor to Provide Labor and Equipment to Load Materials <br />Ellensburg Gement Products <br />1 14,000 Ellensburg BST Crushed Surfacing 1/2 to No. 4 $12.25 $171,500.00 <br />2 3,000 East Kittitas BST Crushed Surfacing 1/2 to No. 4 $12.25 $36,750.00 <br />3 5,000 Cle Elum BST Crushed Surfacing 1/2 to No. 4 $12.25 $61,250.00 <br />4 3,500 Ellensburg BST Crushed Surfacing 3/8 to No. 10 $15.50 $54,250.00 <br />$24,800.0051,600 Cle Elum BST Crushed Surfacing 3/8 to No. 10 $15.50 <br />6 4,000 Ellensburg Maintenance Sand $10.55 $42,200.00 <br />7 4,000 Cle Elum Maintenance Sand $10.55 $42,200.00 <br />8 1,000 Ellensburg <br />1 1/4" Crushed Surfacing Base <br />Course $9.50 $9,500.00 <br />I 1,000 Cle Elum <br />1 1/4" Crushed Surfacing Base <br />Course $9.50 $9,500.00 <br />10 2,000 Ellensburg 5/8" Crushed Surfacinq Top Course $9.60 $19,200.00 <br />11 2,000 Cle Elum 5/8" Crushed Surfacing Top Course $9.60 $19,200.00 <br />12 1,000 Ellensburg 21l2" Ballast $9.50 $9,500.00 <br />13 1,000 Cle Elum 2112" Ballasl $9.50 $9,500.00 <br />$509,350.00Subtotal before Tax - <br />SALES TAX.8.10%$41.257.35 <br />TotalSchedule "B" -$550,607.35 <br />SCHEDULE'B''