Laserfiche WebLink
Priority 1: Huntzinger Rd Safety Improvements <br />I <br />A <br />p <br />Huntzinger Rd <br />Road. Owned By: <br />❑ <br />' <br />o <br />o <br />• Phase 1 is between MP 5.14 to MP 10.74 where road segments have crashes involving injuries and severe <br />injuries, segments with sharp horizontal curves, vertical curves, steep embankments, very little to no <br />shoulder, and areas in need of guardrail, signs and/or delineation. <br />e ESTIMATED COST $1,580,700 <br />• Phase 2 is between MP 2.70 to MP 5.14 where road segments have several horizontal curves, steep <br />embankments, and no shoulder in places with minimal countermeasures in place. <br />ESTIMATED COST $1,457,775 <br />14 <br />