Laserfiche WebLink
2023 Maintenance Rock Materials <br />Bid Opening February 23, 2023, at 2:00 p.m. <br />SCHEDULE'C' <br />Vendor to Provide Labor and Equipment to Load Materials <br />ITEM <br />NO. <br />ESTIMATED <br />QUANTITY <br />in TONS <br />ITEM DESCRIPTION <br />ELLENSBURG CEMENT <br />PRICE PER TON TOTAL PRICE <br />Per Ton <br />15 <br />(Ellensburg) <br />Select Borrow <br />$5.75 $5.75 <br />Per Ton <br />16 <br />(Cie Elum) <br />Select Borrow <br />$6.75 $6.75 <br />Per Ton <br />17 <br />(Ellensburg) <br />Light Loose Riprap <br />$27.50 $27.50 <br />Per Ton <br />18 <br />(Cie Elum) <br />Light Loose Riprap <br />$33.50 $33.50 <br />Per Ton <br />19 <br />(Ellensburg) <br />Quarry Spalls <br />$9.75 $9.75 <br />Per Ton <br />20 <br />(Cie Elum) <br />Quarry Spalls <br />$15.75 $15.75 <br />SALES TAX - <br />8.10% <br />