My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-27-minutes-public-works-study-session
>
Meetings
>
2023
>
03. March
>
2023-03-07 10:00 AM - Commissioners' Agenda
>
2023-02-27-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2023 12:26:34 PM
Creation date
3/2/2023 12:22:30 PM
Metadata
Fields
Template:
Meeting
Date
3/7/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
100147
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Priority 3: Denmark Road Safety Improvements <br />Safety countermeasures and roadway improvements of a sharp comer with steep embankments at MP 3.57 would <br />aid to prevent run -off-road accidents on this specific road as it has a history of accidents at this location and was <br />identified in previous road safety plans as well as the six-year transportation improvement plan. The county included <br />multiple road segments to provide improvements to this entire roadway corridor, from MP 0.50 to MP 4.35 which <br />includes bundling structure crossings to the project for efficiency and cost-effective contract letting, This segment <br />includes five bridges with failing rails and/or no rails within maintenance district K; 79143-ob, 79144, 79261-ob, <br />79262-ob, 79351-ob. Alternatives to address these crossings may include structure widening, structure replacement <br />and the addition of barrier and guardrail. Recent improvements at this site include an extension of the culvert at MP <br />3.57 under Denmark Rd by about 1 5f and the addition of rock to prevent undercutting of road. The shoulders of the <br />roadway were also built up by approximately 2ft on the outside of the comer and 3ft on the inside of the corner. <br />Further countermeasures such as those mentioned in this section are needed as this work itself does not prevent <br />run -off-road events. <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.