My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 2023-032
>
Meetings
>
2023
>
02. February
>
2023-02-21 10:00 AM - Commissioners' Agenda
>
RES 2023-032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:24:39 AM
Creation date
3/1/2023 11:24:32 AM
Metadata
Fields
Template:
Meeting
Date
2/21/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Authorize the Kittitas County Public Works Director's Signature on Task Order No. 1 with Watershed Science and Engineering for the West Interchange Hydraulic Analysis
Order
19
Placement
Consent Agenda
Row ID
99860
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
€+WATERSHED <br />SCIENCE & ENGINEERING February t4,2023 <br />Exhibit A -Scope of Work <br />West Interchange Hydraulic Analysis Scope of Work <br />Kittitas County, WA <br />CenterFuse, a business development authority for the City of Ellensburg, has commissioned a study to <br />develop a land use and development plan for the l-90 West lnterchange area (study area) within Ellensburg <br />and unincorporated Kittitas County, WA (Figure 1). Portions of the study area are located within the <br />mapped FEMA floodplain and floodway of Reecer and Currier Creeks. Kittitas County will provide input to <br />the plan by using existing County hydraulic models to evaluate two alternatives to reduce flooding within <br />the study area. The County has retained Watershed Science & Engineering (WSE)to complete the hydraulic <br />modeling, evaluation, and refinement of the alternatives. The work will be completed using the County's <br />FEMA effective HEC-RAS 2D models of Currier and Reecer Creeks. <br />Figure 1. Approximate West lnterchange Study Area <br />WSE's scope will include the following tasks: <br />Task 1. Data Collection and Review <br />Task 7.7 Ddta Collection dnd Review <br />WSE will collect and review existing data needed to conduct the study. Data will include but not be limited <br />to the effective Flood lnsurance Study (FlS), topographic data including 2019 LiDAR, existing condition land <br />use, and existing building locations. WSE will communicate with CenterFuse's consultant Maul Foster <br />Alongi (MFA) to obtain information on proposed conceptual development plans, existing land ownership, <br />a nd stakeholder objectives. <br />NEECIR CRK CURR!ER CRK <br />t,irtt' 'ltl <br />'t,1"Hl5FtEY r-lRKl- il,:j <br />Huly 97 <br />t <br />* <br />}? <br />t <br />r) <br />*, <br />FrtilPr lsLo <br />pftil -llL'i.:T At{l_A <br />l-90 wEsr <br />IHTERCHANGE
The URL can be used to link to this page
Your browser does not support the video tag.