Laserfiche WebLink
CITY OF CLE ELUM <br />First Street Revitalization Phase 3C <br />Pennsylvania Avenue to Harris Avenue <br />Engineefs Opinion of Construction Cost <br />7120t2022 <br />HIr{ Projecl No. 22010G <br />Item <br />No.Descriptlon Payment <br />Specification Unit Unit Cost Ov€rall <br />Quantlty Overall CoBt <br />1 Minor chenoe 1-O4_4f1 I FA s10,000,00 s10.o00.00 <br />SPCC Plan 1-07.15(1)LS $1.000.00 1 s1_000.00 <br />3 and Historical 1-O7.16(4)FA sl 00 00 sloo 00 <br />4 Mobillzation 'l-o9.7 LS s43.OO0 00 $43,000 00 <br />Prolec{ TemDorary Trafiic Control 1-10.5 LS $15.000.00 1 s1 5.000.00 <br />o Clearino and Grubbinq %o1.5 LS $4.000.00 1 $4.000.oo <br />7 Removal of Structures and Obstruc'tions 2-O2.5 LS $15_OO0 00 'l $15.000 00 <br />ljnclassified Excavalion lncl. Haul 2-O3 5 CY s,too 00 320 $32.000.00 <br />I Crushed Surfaclno Base Cou6e 4-04.5 TON s75.00 EO $5-O00-o0 <br />10 Crushed Surfacino Too Course 4'O4.5 TON sloo.00 s2.400 00 <br />11 HMA Cl. 1 l2-lndt PG 64H-2A 5-()4.5 TON s325 00 32 $'10.400.00 <br />Storm Selver Pipe 6 ln. Diam 7-O4 5 LF $95.00 13 s1.235.00 <br />13 AdluBt C8tch Basin 7-05.5 EA s600_00 s2.400 00 <br />14 D.l. Pioe brWater Main 6 ln. Diam.7-O9.5 LF t8330 00 sl s80 00 <br />5 Relocete waier Meter 7-1 5.5 EA $1.400 00 1 s1.400.00 <br />6 nlei Prolection a-o't 5 EA $125.00 3 $375.00 <br />'t7 flant Selection - RedDoinle MaDle e-1l2" Calioer\8-02.5 EA $625.O0 $2.475 00 <br />18 Plani Selection - Melro Gold MaEl€ (2-112" Cello€r)8-O2.5 EA sE25.O0 $4,125.00 <br />19 Plant Selection - Kelsevi Dodwood (2 Gallon)8-02.5 EA s70 00 u $3.780-00 <br />20 ,lant Seledion - Dwarf Mud6 Pine 12 Gallonl 8-02,5 EA $80.00 10 s800.00 <br />21 Plant Selectlon - Woods Comoacl Kinnikinnick (2 Gallon)8-02.5 EA 660_OO 203 $12.180.00 <br />22 Plant Selectlon - Golden Nuodet Barbenv (2 Gallon)8-02.5 EA tB70_o0 34 $2.380.00 <br />23 Plant Selection - Flower Camet Pink Rose (2 Gallonl 8-O2.5 EA $70 00 23 s'1.610.00 <br />4 ,lant Seleclion - Sun Rose Buroundv Dezzlrr (1 Gallonl 8-02.5 EA $60.00 61 $3.680.00 <br />25 ,lant Selec{ion - Moonbeam CoreoDsis (1 Gallon)8-02.5 EA s60.00 75 $4.500.00 <br />26 )ement Conc. Traflic Curb and Gutter a-o4 5 LF $75.OO 31 $23_250.O0 <br />27 Bench 8-05.5 EA s4.250.OO s8.50D O0 <br />Trash ReceDtacle 8-O5 5 EA s3 000.oo 1 $3.000,00 <br />(e Rack 8-05.5 EA $2.500.00 2 $5.000.oo <br />3r Banner Pole and Foundation 8-05.5 LS s15.000.00 1 s15.000.oo <br />31 Cement Conc. Sidewalk 6-lnch Thick 8-'14 5 SY s1 15.O0 2',lo $24 150 00 <br />32 Cement Conc- Sidelvalk 4-lnch Thick Pafterned 8-14.5 SY s180.o0 70,0 $126.000.00 <br />3 ;ement Conc. Curb RamD 8-14.5 EA $3,500.00 3 $10.500.00gfree Liohtinq Svstem, Comolete 8-20,5 LS s50.000.00 1 $50_ooo.o0 <br />35 SDare Conduit 1 ln. Diam. (Soeaker Wre)8-20,5 LF $6.OO $2_EEO.O0 <br />36 Conduit lnstallation (PSE llluminationl E-20.5 LF $24.OO 3 $9,360,00 <br />37 Peamanent Sionlno 8-2't 5 LS $5.000.00 'l s5.000,00 <br />38 Pavemenl Mailinds 8-22.5 LS $10.000.00 1 $10.000.00 <br />Assumptions:1. South side of Pennsylvania Ave. to Hanis Ave. not including bulbout <br />at Pennsylvania Ave.2, Phase 3G taken from Phase 3 "shovel ready" PS&E. Design <br />Engine€ring @sts are to pull Phase 3C from full Phase 3 PS&E. <br />3 3'wide asphalt tie in (0.42' HMA, 0.17' CSTC, 0.75'CSBC).4. 16'wide sidewalks include amenity zone for pedestrlan llghting, <br />planters, bgnches, trash rcceptacles, elc.5. Street lights and pedestrian illumination are consistent with Council- <br />adopted preferred concept.6, Unit costs taken from 2022 First Street Phase 3A 3B bld summary, <br />May 2022. <br />7, f llumination system based on the costs inlhe 2022 illumination <br />agreement with PSE. <br />Subtotal <br />Contingency',l0% <br />8474,440.OO <br />$47,44/..00 <br />lllumination System (PSE)$1 10,000 00 <br />Total Estimated Construction Cost s63r,884.00 <br />WSDOT CN Fees <br />Design Engineering <br />Construction Engineering 1 5% <br />$15,000.00 <br />$1s,000-00 <br />$94,800.00 <br />2g,6:u 9*///z <br />BgdlfilfiA. Annen, PE Date <br />HLA Englneering and Land Survsying, lnc Total Estlmated Project Cosl $756,684.00 <br />GTPROJECTS\2022\2201 oG\TlB\First Strest Ph. 3C (S. Ha[ls to Pennsylvenla)\First Street R€vitalization Phase 3C - PennBylvania Avenue to hanis Avenue Cost <br />EstimatE