My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 2023-022
>
Meetings
>
2023
>
02. February
>
2023-02-07 10:00 AM - Commissioners' Agenda
>
RES 2023-022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2023 10:01:43 AM
Creation date
2/24/2023 10:01:31 AM
Metadata
Fields
Template:
Meeting
Date
2/7/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution for the 2023 Distressed County Sales and Use Tax Infrastructure Program Agreement with Snoqualmie Pass Utility District
Order
20
Placement
Consent Agenda
Row ID
99173
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT NARRATIVE <br />1. Proiect Description: Describe the scope of work. Indicate the major work involved, including a <br />brief comparison of existing and proposed conditions. <br />Commercial and residential, domestic water and sewer services are provided in the Snoqualmie Pass area <br />by a Special Purpose Dishict (SPD) named Snoqualmie Pass Utility Dishict (SPUD or District). The <br />Dishict is growing at arate of 27% over the past five years. The District currently has720 customers <br />with 602 active accounts using water. The other 118 lots have secured a connection but not yet built a <br />dwelling on their lot. The Diskict's Water Facility plan was adopted in Decernb er 2019 and indicated <br />the need for more water storage and water production. The Diskict recently completed two test wells <br />looking for more water. The results are not finalized but it does not look promising. Thus, the District <br />has pivoted and is now expediting the construction of a water treatment facility at the wells 2/3 site. The <br />plan is to construct a building to house an ATEC water treatment system and a generator to provide back <br />up power. Currently, these wells are physically disconnected due to poor water quality. The water <br />treatment system will improve the water quality and this water will then be pumped into the water <br />dishibution system. The estimate is that this facility could provide 150-200 gpm. Thus, increasing the <br />District's water production by 33%. This is a much-needed production improvement as the Water <br />Facility plan indicates that the District is lagging behind on production und storage due to the current <br />growth rate. <br />2. Explain how the infrastructure project will help meet the economic development goals of your <br />community and/or region. If this project is not done, will the anticipated private development still <br />take place? <br />The Snoqualmie Pass area has reached the limitations on water rights. No more water rights will be <br />issued to the area. The District has been aggressive in reducing the missing watsr. The District has <br />repaired dozens of leaks totaling more than 150 gm, installed all new water meters, and installed a fixed <br />radio read system with a portal that allows customers to monitor water usage and set up leak alerts, <br />The District anticipates the number of residences and businesses will double when current planned <br />developments are completed. The District is aware of developers withplans for 450 homes in Hyak with <br />the first project of a 5O-unit condo to start tn2023. The District is also awareof one development in <br />Yellowstone of 150 homes and another of 27 homes. There is also some recent progress in developing <br />the Gold Creek area. <br />The District's customers include ski resorts and supporting services to travelers on Interstate 90 (I-90) <br />such as rest areas, gas stations, hotels, stores, and restaurants. Multiple conversations with the ski <br />resorts have already been initiated to explain the planned improvemonts to the water systern and <br />wastewater heatment facility. The Dishict's additional water production/capacity will encourage <br />residential construction. An increase in residents during recreational and tourist seasons allows <br />commercial enterprises to draw employees during the seasons in which they would be needed most. <br />Increases in production/capacity can allow comrnercial operations to consider off-peak strategizing to <br />expand operating days and evening use. Related but separate ski resort improvements are being planned <br />to accommodate increased demand. Currently, an estimated 30,000 peoplo travel to Snoqualmie Pass <br />area in the winter on peak woekend days, Increasing snowmaking, expanding hours, adding days to <br />the season, and expanding evening skiing, can increase the number of customers the ski resorts can <br />serve while lessening the impacts ofpeak demand seasonal tourism on infrastructure systems such as <br />3
The URL can be used to link to this page
Your browser does not support the video tag.