Laserfiche WebLink
CITY OF CLE ELUM <br />First Street Revitalization Phase 3C <br />Pennsylvania Avenue to Harris Avenue <br />Engineer's Opinion of Construction Cost <br />HLA Project No 22010G <br />7/20/2022 <br />Item Description <br />No. <br />Payment <br />Specification <br />Unit <br />Unit Cost <br />Overall <br />Quantity <br />Overall Cost <br />I <br />Minor Chane <br />1-04.4(l) <br />FA <br />$10,000.00 <br />1 <br />$10,000,00 <br />2 <br />SPCC Plan <br />1-0715(l) <br />LS <br />$1,000.00 <br />1 <br />31 000.00 <br />3 <br />Archaeological and Historical Salva <br />1-07.16(4) <br />FA <br />$10000. <br />1 <br />$100 00 <br />4 <br />Mobilization <br />1-09.7 <br />LS <br />343.000.00 <br />1 <br />S,13.01)0 00 <br />5 <br />Project Temporary Traffic Control <br />1-10.5 <br />LS <br />$15,00000 <br />1 <br />$15,00000 <br />6 <br />Clearing and Grubbing <br />2-01.5 <br />LS <br />$4.00000 <br />1 <br />$4,000 00 <br />7 <br />Removal of Structures and Obstructions <br />2-02.5 <br />LS <br />$15.000.00 <br />1 <br />$15.000.00 <br />8 <br />Unclassified Excavation Incl. Haul <br />2-03.5 <br />CY <br />3100.00 <br />320 <br />$32 000 00 <br />9 <br />Crushed Surfacing Base Course <br />4-04.5 <br />TON <br />$75.00 <br />80 <br />$6,000.00 <br />10 <br />Crushed Surfacing Top Course <br />4-04.5 <br />TON <br />$100.00 <br />24 <br />$2.40000 <br />11 <br />HMA Cl. 1/2-Inch PG 641-1-28 <br />5-04.5 <br />TON <br />$325.00 <br />32 <br />$1075U-00 <br />12 <br />Stonn Sewer Pipe 5 In. Diem <br />7-045 <br />LF <br />395,00 <br />13 <br />$1,23500 <br />13 <br />Adjust Catch Basin <br />7-05.5 <br />EA <br />S60000 <br />4 <br />$2,400 DO <br />14 <br />D,I. Pipe for Water Main B In. Diam <br />7-09.5 <br />LF <br />$33000 <br />6 <br />$1.8813.00 <br />15 <br />Relocate Water Meter <br />7-15.5 <br />EA <br />S1.40000 <br />1 <br />$1,40000 <br />18 <br />Inlet Protection <br />8-01.5 <br />EA <br />$125.00 <br />3 <br />$375.00 <br />17 <br />Plant Selection - Red irate Maple 2-1/2" Caliper) <br />8-02.5 <br />EA <br />$82500 <br />3 <br />$2,47500 <br />18 <br />Plant Selection - Metro Gold Ma 2-112" Caliper)8.02.5 <br />EA <br />$825 00 <br />1 5 <br />$4,125.00 <br />19 <br />Plant Selection - Kelsey! Dogwood 2 Gallon <br />8-02.5 <br />EA <br />$70.00 <br />54 <br />$3.780.00 <br />20 <br />Plant Selection - Dwarf Mugo Pine 2 Gallon <br />8-02.5 <br />EA <br />580.00 <br />10 <br />5800.00 <br />21 <br />Plant Selection -Woods Compact Kinnikinnick 2 Gallon)8-02.5 <br />EA <br />S6000 <br />203 <br />$12,18000 <br />22 <br />Plant Selection - Golden Nugget Ba 2 Gallon <br />8-02.5 <br />EA <br />$70,00 <br />34 <br />$2,380 00 <br />23 <br />Plant Selection - Flower Carpet Pink Rose 2 Gallon <br />8-02.5 <br />EA <br />$7000 <br />23 <br />$1,610.00 <br />24 <br />Plant Selection - Sun Rose Burgundy Dazzler1Gallon) <br />8-025 <br />FA <br />$60.00 <br />81 <br />$3.66000 <br />25 <br />Plant Selection - Moonbeam Cored is 1 Gallon <br />8-02.5 <br />EA <br />560.00 <br />75 <br />$4,500.00 <br />26 <br />Cement Conc. Traffic Curb and Gutter <br />B-045 <br />LF <br />$75,00 <br />31D <br />$23,250.00 <br />27 <br />Bench <br />8-05,5 <br />EA <br />$4250.00 <br />2 <br />$8,500,00 <br />28 <br />Trash Receptacle <br />B-D5 5 <br />FA <br />$3,ODO.00 <br />1 <br />$3.000.00 <br />29 <br />Bike Rack <br />8-05.5 <br />EA <br />$2,500.00 <br />2E$50.DOO.00 <br />,000.00 <br />30 <br />Banner Pole and Foundation <br />8-05.5 <br />LS <br />$15.000.00 <br />1.000.00 <br />31 <br />Cement Cone Sidewalk e-Inch Thick <br />8-14.5 <br />SY <br />$115.00 <br />21,150.00 <br />32 <br />Cement Conc. Sidewalk 4-Inch Thick Patterned <br />8-14,5 <br />BY <br />$180.00 <br />70.000.00 <br />33 <br />Cement Conc Curb Ram <br />8-14.5 <br />EA <br />$3,500.00 <br />3,500.00 <br />34 <br />Tree Lighting System, Complete <br />&20,5 <br />LS <br />$50.000.00 <br />1 <br />35 <br />Spam Conduit 1 In. Diam. (Speaker Wire <br />8-20.5 <br />LF <br />$6.00 <br />48,680,00 <br />36 <br />Conduit Installation PSE Illumination <br />8-20,5 <br />LF <br />$24.00 <br />39,360.00 <br />37 <br />Permanent Signing <br />8-21,5 <br />LS <br />35,000.00 <br />1,000,00 <br />38 <br />Pavement Markings <br />0-22,5 <br />LS <br />$10,000,OD <br />1,000.00 <br />Assumptions: <br />1. South side of Pennsylvania Ave to Hams Ave. not including bulbout <br />at Pennsylvania Ave <br />2 Phase 3C taken from Phase 3 "shovel ready" PS&E Design <br />Engineering costs are to pull Phase 3C from full Phase 3 PS&E <br />3 3' wide asphalt tie in (0.42' HMA, 0.17' CSTC, 0.75' CSBC). <br />4 16' wide sidewalks include amenity zone for pedestrian lighting, <br />planters, benches, trash receptacles, etc. <br />5. Street lights and pedestrian illumination are consistent with Council- <br />adopted preferred concept <br />6, Unit costs taken from 2022 First Street Phase 3A 3B bid summary, <br />May 2022. <br />7 Illumination system based on the costs in the 2022 illumination <br />agreement with PSE. <br />.�� (f,, 9 /OZL <br />Bialatirgh A. Armen, PE Date <br />HLA Engineedng and Land Surveying, Inc <br />Subtotal <br />Contingency 1D% <br />Illumination System (PSE) <br />Total Estimated Construction Cost <br />WSDOT CN Fees <br />Design Engineering <br />Construction Engineering 15% <br />Total Estimated Project Cost <br />$474,440.00 <br />$47,444.00 <br />$110,000 00 <br />$631,884.00 <br />$15,00000 <br />$15,000.00 <br />$94.60000 <br />$756,684.00 <br />GA-RO3ECTS1202022010G1TIB1Firsl Street Ph. 3C (S. Hams to Pennsylvania)Timt Street Revitalization Phase 3C - Pennsylvania Avenue to liamis Avenue Cost <br />Estimate <br />