Laserfiche WebLink
creation, funding leverage, readiness to proceed, likelihood of success, and overall need for <br />the project" (pg 6). <br />❑ Comprehensive Land Use Plan —Officially Adopted: June 2019 <br />Kittitas County Comprehensive Plan (06/2019)- ; Cle Elum Land Use Plan (06/2019) <br />• Project consistent with multiple goals in Chapter 2, Chapter 3, Chapter 4, Chapter 5, Chapter <br />6, and Chapter 10. <br />❑ Capital Facility Plan — Officially Adopted: Auril 2019 <br />Cle Elum Capital Facilities Plan <br />• Project consist with multiple Kittitas County Countywide Planning Policies as listed in <br />Appendix A and Cle Elum goals in multiple infrastructure sections in the Cle Elum Capital <br />Facilities Plan — Transportation Systems, Domestic Water System, Stormwater System, <br />Sanitary Sewer System, Parks and Recreation sections. <br />❑ Community Action Plan (or other community-based plan) — Officially Adopted: June 2017 <br />Cle Elum Downtown Planning — Focus on I" street Design Concepts <br />• City Council Planning Commission Study Session and Public Forum (2017) AKA <br />"Preferred Alternative." <br />❑ Six -Year Transportation Improvement Plan — Officially Adopted <br />Cle Elum 2023-2028 Transportation Improvement Proms <br />• This project is included in Cle Elum's 2023-2028 Transportation Improvement Program as <br />the City's Number 1 project. <br />❑ Site-specific development plans; e.g., Community Master Plan — Officially Adopted: 2015 & 2018 <br />Downtown Association Main Street Study (2015); <br />Downtown Association Master Plan (2018) <br />❑ Other <br />4. Public Benefit: <br />Please describe the public benefit derived from project completion. <br />Conceptual plans and studies have been prepared for Cle Elum's downtown corridor over the past 20 years <br />to improve traffic flow, optimize parking, and build a pedestrian -friendly environment. The latter has <br />always been a focal point to enhance Cle Elum's tourism experience. The plans also addressed the need <br />for improvements to stormwater facilities throughout the City. Past plans and studies continually lost <br />momentum as the City's limited budget restricted possibilities for advancing forward without financial <br />assistance. <br />With procurement of grants/loans totaling $5.8 million in 6.5 years, Cle Elum residents and business <br />owners have acknowledged the reality of the downtown revitalization coming to fruition. The rigorous <br />planning process discussed in Question 5 included feasibility analysis of design alternatives, followed by <br />adoption of the preferred alternative by City Council. Though the planning process did not include a market <br />study and potential economic outcomes following completion of the revitalization, comparisons were made <br />