My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sub Recipient - HopeSource
>
Meetings
>
2023
>
02. February
>
2023-02-07 10:00 AM - Commissioners' Agenda
>
Sub Recipient - HopeSource
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 12:05:12 PM
Creation date
2/2/2023 12:03:30 PM
Metadata
Fields
Template:
Meeting
Date
2/7/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Authorizing a Contract Amendment with HopeSource Regarding CDBG-CV Contract Number 20-6221C-115
Order
7
Placement
Consent Agenda
Row ID
99173
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT6-G(2) <br />NEPA <br />4.Economic Development Activities: <br />Equipment purchase Interest subsidy <br />•Inventory financing Operating costs <br />Other expenses not associated with construction or expansion <br />5.Activities to assist homeownership of existing or dwelling units under construction,including:O •Closing costs and down payment assistance to homebuyers <br />Interest buy downs or other actions resulting in transferof title <br />6.Affordable housing pre-development costs <br />Legal consulting <br />O •Developer and other site-option costs <br />*Projectfinancing <br />•Administrative costs for loan commitments,zoning approvals,and other activities which don't have a physical impact i <br />7.Approval of supplemental assistance (including insurance or guarantee)to a project previously approved under Part58,if: <br />O the same responsible entity conducted the environmental revlew on the original project and re-evaluation of the <br />environmental findings is not required under Section 58.47 <br />Additional HUD Laws &Authorities (24 CFR 58.6) <br />Section 1.Flood Disaster Protection Act <br />Sectíon 58.6 regulres compliance with the Flood Disaster Protection Act.However,under 24 CFR 55.1(b)(1)the prohibitions are <br />not applicable to HUD financial assistance under the State-administered COBG Program (24 CFR part 570,subpart I).Therefore,the <br />Act does not apply. <br />Section 2.Airport Runway clear Zones (Civil)and Accident Potential Zones (Military) <br />(Check as appropriate) <br />Does the project involve HUD assistance,subsidy or insurance for the purchase or sale of <br />an existing property?O YES NO <br />Proceed to Section 3-Continue <br />|regulation does not apply. <br />Is the project located within 2,500 feetof a civil airport or 15,000 feet of a military airfield?O YES NO <br />Continue Document &proceed to <br />Section 3-regulation <br />does not apply. <br />Is the project located within an FAA-designated civilian airport Runway Clear Zone (RCA)or YES NORunwayProtectionZone,or within the military Airfield Clear Zone (CZ)or Accident Continue Document &proceed toPotentialZone/Approach Protection Zone (APZ),based upon information from the airport section 3-regulationormilitaryairfieldadministratoridentifyingtheboundariesofsuchzones?does not apply. <br />Comply with 24 CFR Part 51,Subpart D which may include providing a written notice to a prospective buyer or leaser of the <br />|potential hazards from airplane accidents and the potential that an airport or airfield operator may wish to purchase the property <br />at some point in the future as part of a clear zone acquisition program.Maintain copies of the signed notice.For properties <br />located in a military clear zone,make and document a determination of whether the use of the property is generally consistent <br />with DOD guidelines.Notice Sample; <br />btlolLeadmLaav&f.fic.esLA environiumkirvjaama.Mmerib.amerism <br />Section 3.Coastal Barrier Resources Act. <br />Section 58.6 also requires compliance with the Coastal Barrier Resources Act.There are no Coastal Barrier Resource Areas in <br />|Washington State.Therefore,the Act does not apply. <br />NEPA CERTIFICATION <br />A Request for Release of Funds (RROF)is not required for this project.The activity may be initiated without further environmental <br />review beyond 24 CFR Part 58.6. <br />SEPA CERTIFICATION <br />The Grantee certifies that the proposed CDBG project complies with the provisions of the State Environmental Protection Act (SEPA, <br />chapter 43.21C RCW)and has determined: <br />Contract Page 038
The URL can be used to link to this page
Your browser does not support the video tag.