My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-22-00005 Suncadia Ph 2 Div 8 - Master File Indexed
>
Meetings
>
2023
>
01. January
>
2023-01-03 2:00 PM - 2:00pm Public Hearing
>
LP-22-00005 Suncadia Ph 2 Div 8 - Master File Indexed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2022 12:10:03 PM
Creation date
12/29/2022 12:06:16 PM
Metadata
Fields
Template:
Meeting
Date
1/3/2023
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Public Hearing to consider the Suncadia Phase 2 Division 8 Preliminary Plat.
Order
1
Placement
2:00pm Public Hearing
Row ID
97615
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Incomplete or illegible applications will be returned. KCPD 2-02 <br />1 <br />Attachment to <br />SEPA Environmental Checklist <br />Phase 2 Division 8 <br />Introduction <br />This attachment contains information requested on the Kittitas County SEPA Environmental <br />Checklist which exceeded the area provided in the form. <br />A. BACKGROUND <br />3. LIST ANY ENVIRONMENTAL INFORMATION YOU KNOW ABOUT THAT HAD BEEN <br />PREPARED, OR WILL BE PREPARED, DIRECTLY RELATED TO THIS PROPOSAL. <br />The following environmental information has been prepared for the MountainStar MPR <br />Project: <br />§MountainStar Master Planned Resort Draft Environmental Impact Statement, Volumes I- <br />III, July 1999. (“DEIS”) <br />§MountainStar Master Planned Resort Final Environmental Impact Statement, Volumes 1-4, <br />April 2000. (“FEIS”) <br />§MountainStar Master Planned Resort Environmental Impact Statement Addendum, March <br />2002. (“EIS Addendum”) <br />§MountainStar Properties/Cle Elum Urban Growth Area Final Environmental Impact <br />Statement, February 2003. (“Cle Elum FEIS”) <br />B. ENVIRONMENTAL ELEMENTS <br />1. EARTH <br />d. Are there surface indications or history of unstable soils in the immediate vicinity? <br />Potential landslide hazards are discussed in Sections 3.1 and 4.1 and Appendix B of the MPR <br />DEIS. The proposed developed area the Phase 2 Division 8 plat has been mapped in the Erosion <br />Hazard Map (Figure 4-13 of the MPR DEIS) as Zone 5 “Low Hazard Risk.” The undeveloped <br />portion of Phase 2 Division 8 consisting of steep slopes has been mapped as Zone 1 “High to <br />Severe Hazard Risk” and will have appropriate building setbacks from the top of slope per the <br />geotechnical report. <br />e. Describe the purpose, type, and approximate quantities of any filling or grading <br />proposed. Indicate source of fill. <br />For the Phase 2 Division 8 lot, roadway, and utility infrastructure construction, the estimated <br />grading quantities are approximately 1,000 cubic yards of cut and approximately 3,000 cubic <br />yards of fill, which yields a net fill of approximately 2,000 cubic yards. Fill material will likely <br />Index #21
The URL can be used to link to this page
Your browser does not support the video tag.