Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />October 5, 2022 Job No. 998-883-022 <br /> <br /> <br /> <br /> <br />Ms. Kelly Bacon <br />Kittitas County Community Development Services <br />411 North Ruby Street, Suite 2 <br />Ellensburg WA 98926 <br /> <br />RE: Suncadia Phase 2 Division 8 <br /> Site Development Plan and Preliminary Plat <br /> <br />Dear Kelly: <br /> <br />On behalf of Suncadia Resort LLC, ESM Consulting Engineers L.L.C. is submitting 2 copies <br />and a PDF on CD of the enclosed listed documents in support of Phase 2 Division 8 Site <br />Development Plan and Preliminary Plat: <br /> <br /> Long Plat Application <br /> SEPA Checklist and SEPA Attachment <br /> Site Development Plan Exhibit <br /> Project Narrative <br /> Preliminary Site and Utility Engineering Summary <br /> Exhibit M <br /> Conceptual Utility Exhibit <br /> Preliminary Plat Sheets <br /> Certificate of Title (Title Report) <br /> <br />In addition, the following information is also provided: <br /> <br />Owner of Record: Suncadia Resort LLC <br />770 Suncadia Trail <br />Cle Elum, WA 98922 <br />509-649-6119 <br />Contact: Mr. Lathan Wedin <br /> <br />Additional Authorized Agent: F. Steven Lathrop <br />Lathrop, Winbauer, Harrel, Slothower & Denison LLP <br />P. O. Box 1088 <br />Ellensburg, WA 98926 <br />509-925-6916 <br /> <br /> <br /> <br /> <br /> <br />Index #21