My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-22-00005 Suncadia Ph 2 Div 8 - Master File Indexed
>
Meetings
>
2023
>
01. January
>
2023-01-03 2:00 PM - 2:00pm Public Hearing
>
LP-22-00005 Suncadia Ph 2 Div 8 - Master File Indexed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2022 12:10:03 PM
Creation date
12/29/2022 12:06:16 PM
Metadata
Fields
Template:
Meeting
Date
1/3/2023
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Public Hearing to consider the Suncadia Phase 2 Division 8 Preliminary Plat.
Order
1
Placement
2:00pm Public Hearing
Row ID
97615
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page | 1 <br /> <br />411 North Ruby Street, Suite 1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 <br /> <br /> <br /> <br /> <br /> <br />M E M O R A N D U M <br /> <br />TO: All Staff <br />FROM: Public Works Plan Review Team <br />DATE: November 3, 2022 <br />SUBJECT: LP-22-00005 Suncadia Phase 2 Division 8 <br /> <br />ACCESS • Per the Suncadia 2009 Development Agreement section 5.3 <br />Infrastructure, Surety Bonding or Other Assurances. Infrastructure <br />identified by Trendwest in an approved Site Development Plan must <br />be provided and available for use before the issuance of the first <br />certificate of occupancy for Master Planned Resort Accommodation <br />Units included within such plan. For purposes of final plat approval <br />or issuance of building permits, infrastructure may be guaranteed <br />through surety bonding or other financial assurance device <br />acceptable to the County. The estimated costs of providing all such <br />guaranteed Infrastructure shall be reviewed and approved by the <br />County Public Works Director or designee. Surety bonding or other <br />acceptable financial device provided to the County shall be in an <br />amount equal to at least 110% of such estimated costs as <br />determined by Trendwest’s architects and engineers. <br /> <br />Exhibit F-1 Suncadia MPR Conditions of Approval: <br /> <br />A-2 (a) Required Infrastructure and Utilities, as defined in the <br />Development Agreement, shall be installed, and completed or <br />bonded or other financial guaranties or accommodations made for <br />their completion prior to final plat. <br /> <br />• Stormwater, please provide design calculations for treatment and <br />disposal areas. If utilizing an existing system, please provide an <br />accounting affirming sufficient capacity <br /> <br />• While Suncadia is in the process of completing the Traffic <br />Monitoring Plan, please submit an update report detailing what <br />monitoring has been completed. This update report will be required <br />for Final Plat. <br /> <br /> <br />DEPARTMENT OF PUBLIC WORKS <br />Index #31
The URL can be used to link to this page
Your browser does not support the video tag.