Laserfiche WebLink
November 2, 2022 <br />Kittitas Community Development Services <br />411 N Ruby St, Suite 2 <br />Ellensburg, WA 98926 <br />Re: Long Plat 22-00005!"Suncadia Phase 2 Division 8” <br />Before the CDS Staff recommend to the commissioners to approve this latest <br />development from “Suncadia Resort LLC” please consider and fully address these <br />issues: <br />1. The developer continues to thumb their nose at the rules and protocols <br />established and agreed to in the “December 2008 Amended and Restated <br />Development Agreement Exhibit F-1” as I have indicated in the past. <br />Specifically, they are in violation of Sections B-43 and B-44 both of which <br />impact air quality. They have also failed to comply with C-29. At no time since <br />moving here full time in 2019 have any of these three conditions been met by the <br />developer. A plan needs to be implemented to monitor the developer and <br />establish corrective measures for non-compliance. <br />2. The developer’s response to SEPA Environmental Checklist item 14.h does not <br />say they will comply, it merely directs you, the CDS staff to “please refer to the <br />MPR Conditions of Approval, sections C-1 through C-20B”. Note - this is the <br />exact document I refer to above, technically known as Exhibit F-1 to The <br />Agreement, which they have continually violated. While referring to this <br />specific section of Exhibit F-1 to imply compliance, they have actually <br />highlighted their LACK of compliance with item C-17, Traffic Monitoring <br />Program. When will CDS and/or Public Works demand completion of the <br />stipulated Traffic Monitoring Program? <br />3. SEPA Checklist Attachment 13.b indicates the developer will remove the <br />historic water line (KT02147) which is part of the Roslyn Water system without <br />any regard to its possible historic significance. According to the February 24, <br />2022 letter from the Washington Department of Archaeology & Historic <br />Preservation to Kelly Bacon, Planner 1, KCCDS, “It should be determined <br />whether the segment of the Roslyn Waterline Complex (KT02147) that passes <br />Index #28