My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022 Docket Enabling Ordinance (2)
>
Meetings
>
2022
>
12. December
>
2022-12-20 10:00 AM - Commissioners' Agenda
>
2022 Docket Enabling Ordinance (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2022 11:04:51 AM
Creation date
12/19/2022 11:03:27 AM
Metadata
Fields
Template:
Meeting
Date
12/20/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Ordinance Adopting the 2022 Annual Docket Amendments to Kittitas County Code and Comprehensive Plan
Notes
Amended vote for Docket Item 22-22, language for SEPA appeal hearing in Docket Item 22-25, and revised code language for Docket Item 22-1.
Order
14
Placement
Consent Agenda
Row ID
97382
Type
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />6. Timeframe for implementing permits. Implementing permits, including land divisions for <br />lot sales or building permits when there is no associated land division, shall be <br />submitted within two (2) years of final development plan approval. <br />7. PUDs approved prior to 2007. Planned unit developments with preliminary development <br />plans approved prior to adoption of the expiration standards contained in Ordinance <br />2007-22 shall have until December 31. 2017, to submit final development plans and <br />shall be subject to the timeframes established in subsection 6 above for implementing <br />permits. Undeveloped PUDs with final development plans approved prior to 2007 shall <br />have until December 31, 2015, to complete land divisions for lot sales or building <br />permits when there is no associated land division. Failure to obtain final plan or permit <br />approvals or make substantial progress toward such approvals within the time frames in <br />this subsection shall result in expiration without prejudice. <br />8. Lapse of zoning. If the planned unit development is not completed within the time <br />periods in this section, the rezone to Planned Unit Development Zone is void for the <br />area not completed, and the official zoning map shall be amended to the underlying <br />zoning. (Ord. 2013-001, 2013; Ord. 2007-22, 2007) <br /> <br /> <br />Chapter 17.40 <br />C-G - GENERAL COMMERCIAL ZONE* <br />Sections <br />17.40.010 Purpose and intent. <br />17.40.015 Development within the Ellensburg Urban Growth Area UGA) <br />17.40.020 Allowed uses. <br />17.40.030 Lot size required. <br />17.40.040 Maximum lot coverage. <br />17.40.050 Maximum floor area. <br />17.40.060 Yard requirements. <br />17.40.070 Height restriction. <br />17.40.080 Repealed. <br />17.40.090 Access requirement. <br />17.40.100 Half streets. <br />17.40.110 Repealed. <br />* Prior history: Ords. 69-7, 2. <br />17.40.010 Purpose and intent. <br />The purpose and intent of the general commercial zone is to provide a classification consistent with <br />existing business districts in unincorporated towns (i.e., Vantage, Easton) where a wide range of <br />community retail shops and services are available. (Ord. 83-Z-2 (part), 1983) <br />17.40.015 Development within the Ellensburg Urban Growth Area (UGA) <br />For properties located within the City of Ellensburg UGA, the use and development standards in KCC <br />17.11.030 through 17.11.039 shall be utilized. Where KCC 17.11.030 through 17.11.039 does not
The URL can be used to link to this page
Your browser does not support the video tag.