Laserfiche WebLink
Kittitas County Capital Improvement Program December 20, 2022 <br /> <br />2023-2028 Summary Page 5 <br />Table 1 continued - Six-Year Plan Summary <br />2023-2028 Summary Kittitas County Public Facility Projects <br />Project Name Location & Description Funding Source Schedule Total Cost <br />Hungry Junction Road <br />Widening <br />MP 0-MP 1.74, Hungry <br />Junction Road, <br />Ellensburg <br />Reconstruction and <br />safety <br />Planned RAP <br />funds, local <br />funds <br />2023-2025 $4,101,000 <br />Cooke Canyon Rd Bridge <br />Replacement <br />MP 0.24, Cooke Canyon <br />Rd, Bridge replacement <br />Local Bridge <br />Program, Local <br />Funds <br />2023-2024 $2,673,000 <br />Faust Rd Bridge <br />Replacement <br />MP 0.59, Faust Rd., <br />Town Ditch, Bridge <br />Replacement <br />Local Bridge <br />Program, Local <br />Funds <br />2023-2024 $2,532,000 <br />Intersection and Corridor <br />Safety Improvements <br />Various <br />Safety improvements <br />and countermeasures <br />HSIP, Local <br />Funds 2023 $382,000 <br />Bridge Rail Improvements <br />Code 3, (MD A-F) <br />Various. <br />Safety improvements <br />and countermeasures <br />HSIP, Local <br />Funds 2023 $601,000 <br />Vantage Highway over <br />Cascade Canal (89342) <br />Replacement <br />MP 5.17-5.33, <br />Ellensburg <br />Safety improvements <br />and countermeasures <br />STBG 2023 $249,000 <br />Airport Road Sidewalk <br />Replacement <br />MP 1.35-1.85, Bowers <br />Road, Ellensburg <br />Improvements and <br />increased drainage <br />Local funds 2023 $78,000 <br />Progress Path – Ph. 2, Cle <br />Elum to Roslyn <br />Cle Elum to Roslyn, <br />Develop a paved path <br />from existing. <br />Safe Routes to <br />School, Local <br />Funds <br />2023-2024 $410,000 <br />HSIP 2023-2025 Awarded <br />Project Various, TBD HSIP, Local <br />Funds 2024-2025 $1,150,000 <br />Badger Pocket Area Road <br />Improvements, Payne Rd, <br />Phase 1 <br />MP 0.0 – MP 1.55, <br />Safety, rehabilitation, <br />and improvements <br />Local Funds 2024-2025 $3,700,000 <br />Yellowstone Rd Culvert <br />Replacement <br />MP 0.65 – MP 0.75 <br />Snoqualmie Pass, <br />Culvert Replacement <br />Local Funds 2024-2025 $1,755,000 <br />Denmark Road <br />Improvement <br />MP 3.08-4.35 <br />Safety, bridge <br />replacement, and other <br />improvements <br />RAP, Local <br />Funds 2025-2027 $4,610,000 <br />Badger Pocket Area Road <br />Improvements, Phase 2 <br />Various. <br />Safety, rehabilitation, <br />and improvements <br />Local Funds 2025-2026 $2,780,000 <br />Airport Road Culvert <br />Replacement <br />MP 2.25-2.4, Cle Elum <br />Drainage improvement <br />and flood reduction <br />Local Funds 2026-2027 $1,290,000 <br />Short Span Bridge <br />Replacement, Phase 1 <br />Snoqualmie Pass <br />Safety <br />Planned STBG, <br />Local Funds 2025-2026 $1,400,000 <br />Badger Pocket Road HMA <br />MP 0.0-0.57, Ellensburg <br />Rehabilitation and <br />maintenance <br />Local Funds 2025-2026 $1,640,000