Laserfiche WebLink
<br />Project Name: #11 Wilson-Naneum-Cherry Phase 2 <br />Wilson-Naneum-Cherry <br />Last Updated: June 21, 2021 <br />Basis for Project: Wilson-Naneum-Cherry Assessment Schedule: 2023 <br />Project Description: <br />Hydrologic analysis with existing 2-D model to evaluate a potential Whiskey Creek tie-in at the Reecer Creek Floodplain project. <br />Evaluate the effects of Mercer Creek fiow routing north of the airport on hydrologic regime, determine the design speciflcations <br />needed at proposed railroad crossing, evaluate the available fiood capacity within Reecer Creek fioodplain site, and assess w ater <br />-right considerations downstream of the proposed reroute site. <br /> <br />Status: Planned project <br />Flood Impacts: Decreased fiood risk to the West Ellensburg Community. <br />For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us <br />Funding <br />• FCZD Levy