My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023 - 2028 Six-Year Capital Improvement Plan
>
Meetings
>
2022
>
12. December
>
2022-12-20 2:00 PM - 2:00pm Public Hearing
>
2023 - 2028 Six-Year Capital Improvement Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2022 12:19:36 PM
Creation date
12/15/2022 12:17:12 PM
Metadata
Fields
Template:
Meeting
Date
12/20/2022
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Public Hearing to consider Capital Improvement Program for the Planning Period 2023-2028.
Order
2
Placement
2:00pm Public Hearing
Row ID
97391
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kittitas County Capital Improvement Program December 20, 2022 <br /> <br />2023-2028 Summary Page 11 <br />Table 1 continued - Six-Year Plan Summary <br />2023-2028 Summary Kittitas County Public Facility Projects <br />Project Name Location & Description Funding Source Schedule Total Cost <br />Wilson-Naneum-Cherry – <br />Phase 2 Whisky Reroute <br />Feasibility Study <br />WNC. <br />Hydrologic analysis with <br />existing 2-d model to <br />evaluate Whiskey Creek <br />tie-in at Reecer Creek <br />project. Evaluate effects <br />of Mercer Creek flow <br />routing north of the <br />airport on hydrologic <br />regime, design <br />specification needed at <br />proposed railroad <br />crossing, and within <br />Reecer Creek floodplain <br />site, and water needs <br />downstream of proposed <br />reroute site <br />FCZD Levy 2023 $100,000 <br />Wilson-Naneum-Cherry – <br />Phase 3 Whisky Reroute <br />Design <br />WNC. <br />Implement capital <br />recommendations from <br />Phase 2 Feasibility Study <br />FCZD Levy, <br />Flood Control <br />Assistance <br />Account <br />Program <br />(potential) <br />2025-2027 $600,000 <br />Flow Conveyance <br />Restoration – Site 2 <br />WNC. <br />Implementation of <br />project similar to Mercer <br />at Helena flow <br />conveyance project, site <br />TBD <br />FCZD Levy, <br />Ecology <br />Centennial <br />Clean Water <br />grant <br />(potential) <br />2023-2024 $360,000 <br />Flow Conveyance <br />Restoration – Site 3 <br />TBD. Implementation of <br />project similar to Mercer <br />at Helena flow <br />conveyance project, site <br />TBD <br />FCZD Levy, <br />Ecology <br />Centennial <br />Clean Water <br />grant <br />(potential) <br />2025-2026 $392,000 <br />Crystal Creek Conveyance <br />Project <br />Crystal Creek. <br />Implement project <br />identified through <br />Crystal Creek CTP <br />study. <br />Grant funding <br />TBD 2023-2024 $120,000 <br />Manastash – Cove Road <br />Replacement <br />Manastash. <br />Replace existing Cove <br />Road bridge with bridge <br />of sufficient freeboard <br />and span to pass <br />sediment and flood <br />flows. <br />2026: Design and <br />Permitting. <br />FCZD Levy, <br />Road Fund, <br />Flood Control <br />Assistance <br />Account <br />Program <br />(potential) <br />2027-2028 $200,000
The URL can be used to link to this page
Your browser does not support the video tag.