My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023 - 2028 Six-Year Capital Improvement Plan
>
Meetings
>
2022
>
12. December
>
2022-12-20 2:00 PM - 2:00pm Public Hearing
>
2023 - 2028 Six-Year Capital Improvement Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2022 12:19:36 PM
Creation date
12/15/2022 12:17:12 PM
Metadata
Fields
Template:
Meeting
Date
12/20/2022
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Public Hearing to consider Capital Improvement Program for the Planning Period 2023-2028.
Order
2
Placement
2:00pm Public Hearing
Row ID
97391
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AREANon-Local Source2023 Local2023 Non-Local2024 Local2024 Non-Local2025 Local2025 Non-Local2026 Local2026 Non-Local2027 Local2027 Non-Local#1a FLOOD HAZARD RISK & REPETITIVE LOSS PROGRAM County Wide 10 40 40 30 110 <br />#1b REP. LOSS: EASTON REACH FLOOD STUDY Yakima River FCAAP 80 <br />#3 RINGER LOOP PROPERTY IMPROVEMENTS Ringer Reach IP 200 200 200 200 <br />#5 HANSON LEVEE AND PRIVATE BERM REMOVAL Ringer Reach SRFB / IP 15 50 90 510 90 510 <br />#6 REECER CREEK DOLARWAY TO UNIVERSITY WNC City of Ellensburg 850 <br />#7 STREAM GAGING AND EARLY WARNING SYSTEM County-Wide 50 50 50 50 50 <br />2023 site additions: Wilson Creek, Reecer Creek, Crystal Creek <br />#8 CTP FLOOD STUDIES General CTP 30 140 60 100 60 100 60 100 <br />#10 WHISKEY CREEK AT EWC SIPHON WNC Private <br />#11 WNC-Phase 2 Whiskey Reroute Feasibility Study WNC 100 <br />#12 WNC-Phase 3 Whiskey Reroute Design WNC FEMA / FCAAP 20 80 100 400 <br />Implement capital recommendations from Phase 2 Feasibility Study <br />#14 FLOW CONVEYANCE RESTORATION - SITE 2 WNC Ecology 20 70 270 <br />#15 FLOW CONVEYANCE RESTORATION - SITE 3 TBD Ecology 20 82 290 <br />#16 CRYSTAL CREEK CONVEYANCE PROJECT Crystal Creek 20 100 <br />Implement project identified through Crystal Creek CTP study <br />KITTITAS COUNTY FLOOD CONTROL ZONE 2023-2028 <br />SIX YEAR CAPITAL IMPROVEMENT PLAN <br />Comprehensive Flood Planning and Repetitive Loss Hazard Assessment <br />Control for invasive species, riparian buffer plantings, and building decomissioning at County-owned properties <br />Implementation of preferred alternantive from Hanson Pits Restoration Plan and Design . 2023 SRFB design only <br />grant. <br />Flood Control Zone District Cost share in support of City of Ellensburg Project to purchase property, construct setback <br />levees and construct second bridge alongg Dolarway Rd. <br />Continued funding through FEMA's Cooperating Technical Partnership (CTP) program to improve flood models and <br />channel migration zone mapping. <br />Increase flood conveyance, eliminate canal / creek intermingling, and address fish passage barrier by replacing <br />current EWC crossing at Whiskey Creek with a siphon. KCCD managed project, with FCZD cost-share. <br />Hydrologic analysis with existing 2-d model to evaluate Whiskey Creek tie-in at Reecer Creek project. Evaluate effects <br />of Mercer Creek flow routing north of the airport on hydrologic regime, design specification needed at proposed <br />railroad crossing, and within Reecer Creek floodplain site, and water needs downstream of proposed reroute site. <br />Implementation of project similar to Mercer at Helena flow conveyance project, site TBD <br />Implementation of project similar to Mercer at Helena flow conveyance project, site TBD <br />Costs are shown as thousands
The URL can be used to link to this page
Your browser does not support the video tag.