My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023 - 2028 Six-Year Capital Improvement Plan
>
Meetings
>
2022
>
12. December
>
2022-12-20 2:00 PM - 2:00pm Public Hearing
>
2023 - 2028 Six-Year Capital Improvement Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2022 12:19:36 PM
Creation date
12/15/2022 12:17:12 PM
Metadata
Fields
Template:
Meeting
Date
12/20/2022
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Public Hearing to consider Capital Improvement Program for the Planning Period 2023-2028.
Order
2
Placement
2:00pm Public Hearing
Row ID
97391
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CRP/RC #: 286-18 <br />Resolution #: 2018-054 <br />Location: MP 1.11-MP 1.21 Bar 14 Rd, Ellensburg <br />Last Updated: 8/29/2022 <br />Project Number: RC1583-G1 Length: 0.5 miles <br />Basis for Project: Repair Flood Damage and School Bus Turnaround Construction: TBD <br />Project Description: <br />2017 Öood events caused water to overtop Bar 14 Road at Bridge #89041. Subsequent inspection found signiÕcant damage <br />to one of the girders. The County decided to remove the bridge and complete channel repair work to alleviate Öood problems. While the County plans to pursue funding to replace the bridge, the funding is competitive and Bar 14 Road does not see <br />much daily trafÕc. Since the likelihood of obtaining funds in the near future is remote, the county will build a turnaround at each dead end until funding is secured. Work will be done by County Forces. <br />Status: Planned <br />TrafÕc Impacts: Minimal, but TBD. <br />For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us <br />Funding Source: <br />Local <br />funding <br /> $200,000 <br />Total: $200,000 <br />Bar 14 Road <br />Turnaround 28 <br />Flood event of 2017; overtopping bridge. Bar 14 Rd with barricades after bridge removed.
The URL can be used to link to this page
Your browser does not support the video tag.