My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023 - 2028 Six-Year Capital Improvement Plan
>
Meetings
>
2022
>
12. December
>
2022-12-20 2:00 PM - 2:00pm Public Hearing
>
2023 - 2028 Six-Year Capital Improvement Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2022 12:19:36 PM
Creation date
12/15/2022 12:17:12 PM
Metadata
Fields
Template:
Meeting
Date
12/20/2022
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Public Hearing to consider Capital Improvement Program for the Planning Period 2023-2028.
Order
2
Placement
2:00pm Public Hearing
Row ID
97391
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CRP/RC #: 285-18 <br />Resolution #: 2018-054 <br />Location: MP 0.0 to MP 0.68 Ellensburg <br />Last Updated: 8/29/2022 <br />Project Number: RC1585-F1 Length: 0.68 miles <br />Basis for Project: New Construction and Improvements Construction: 2028 <br />Project Description: <br />Widen Bender Road to accommodate the increase in trafÕc and to link future developments to the City of Ellensburg and pro- <br />vide space for bicyclist along the shoulder. Work includes shoulder widening and resurfacing the road, construction of side-walk, and installation of drainage structures. Sidewalk to be constructed on north side of roadway only. <br /> <br />Status: Design and Right of Way phases 2027 with construction in 2028 <br />TrafÕc Impacts: TBD <br />For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us <br />Bender Rd Widening & <br />Pedestrian Improvements <br />Funding Source: <br />RAP <br />Local <br />funding <br /> <br /> $2,070,000 <br />$230,000 <br />Total: $2,300,000 <br />24
The URL can be used to link to this page
Your browser does not support the video tag.