Laserfiche WebLink
<br />CRP/RC #: <br />Location: MP 0.86 Reecer Creek Rd/Town Ditch <br />Last Updated: 8/29/2022 <br />Reecer Creek Rd Bridge <br />Replacement <br />Basis for Project: Bridge Replacement Construction: 2027 <br />Project Description: <br />Bridge #88212 on Reecer Creek Road over the Town Ditch is currently load restricted and structurally deÕcient. Work will in- <br />clude replacement of the bridge with a much larger structure to meet current design standards. <br />Status: Design and Right of Way phases 2026 with construction in 2027 <br />TrafÕc Impacts: To be determined with design. <br />For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us <br />Project Number: Length: 0.01 mile <br />Funding Sources: <br />Local Bridge <br />Program <br />$2,365,000 <br />Local Funds $369,000 <br />Total: $2,734,000 <br />Reecer Creek Rd looking South Overhead aerial <br />22