My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SCS Engineers Professional Service Agreement
>
Meetings
>
2022
>
12. December
>
2022-12-06 10:00 AM - Commissioners' Agenda
>
SCS Engineers Professional Service Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 11:54:50 AM
Creation date
12/12/2022 11:54:33 AM
Metadata
Fields
Template:
Meeting
Date
12/6/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Professional Service Agreement with SCS Engineers
Order
7
Placement
Consent Agenda
Row ID
96854
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 7.5 NPDES Permitting. <br />SCS will assist the County in obtaining coverage under Ecologr's Construction Stormwater General <br />Permit. We will develop a Notice of lntent (NOl) application with supporting documentation, such as <br />stormwater pollution prevention plans;spill prevention control and countermeasure (SPCC) plans (as <br />required), BMPs for sediment, erosion, and pollution prevention control measures, etc. <br />Task 7.6 Environmental Compliance Tracking. <br />The County has completed substantial permitting efforts including SEPA checklist, JARP, and United <br />States Army Corp of Engineers (USACE) Nationwide Permit (NWP) 39, etc. As a follow up to the <br />aforementioned Task 2, SCS will assist the County in reviewing and complying with the permit <br />conditions listed in active environmental permits and agency approvals during project design and <br />construction phases. <br />Deliverableso FAA Notification Letter.o Solid Waste Permit (Transfer Station, Composting, MRW).o Site Development Permit.o Air Quality Permit.o NPDES Permit. <br />Task 7 Assumptionsr Address up to two (2) sets of comments for each document from regulatory agencies. <br />Task B - Bidding Phase Services <br />SCS will assist the County during the bidding phase (assuming 1 month) by conducting a pre-bid <br />conference, responding to contractor questions, and preparing & issuing an addendum. SCS will <br />review contractor bids and provide a Recommendation of Award letter. SCS assumes that the County <br />will issue contract documents to interested contractors. <br />Deliverableso Conduct and attend a Pre-Construction Conference - One (L)SCS Team member in <br />attendance.o lssue Addendum.o Prepare Recommendation of Award letter. <br />Task B Assumptionso One-month bid period.o County will issue bid documents to interested contractors.r Pre-bid conference will be conducted in Ellensburg at a location selected by the County.o County will present the contract award to the Board of County Commissioners (BOCC). <br />Professional Se rvices Ag ree ment (r ev . 09 124 I 20 1 8) <br />Page 18 of23
The URL can be used to link to this page
Your browser does not support the video tag.