Administration Building - assumption includes stick built or block construction <br />(approximately 2,500 to 3,000 square foot [sf]). <br />Scalehouse - assumption includes stick built or block construction (approximately 300 to <br />400 sf). <br />Transfer Building - assumption includes pre-engineered Metal Building (PEMB), three <br />sided, designed to allow for installation of doors in the future, approximately 30,000 sf, <br />pushwalls, load-out port, drive through-trailer tunnel, odor misting system, 300 sf <br />enclosed operators break area, sprinkler system required, no heating, ventilation, air <br />conditioning (HVAC). <br />Moderate Risk Waste - Assumption includes approximately 2,000 sf steel canopy. <br />Compost area includes Aerated Static Pile Design to process approximately 3,000 to <br />4,000 tons per year of green waste material. <br />a <br />a <br />a <br />a <br />Coordination with the City of Ellensburg to provide electrical service to the site. <br />Weekly design coordination calls (1-hour each). <br />Leadership in Energyand Environmental Design (LEED) not required. <br />Fire flow test to be coordinated by the County. Existing water pressure will be adequate <br />and a fire flow booster pump not required. <br />Task 5 - Final Design - 90 Percent <br />SCS will advance the design to the 90 percent complete level with a "check" set of drawings and <br />specifications at the 60 percent completion level to allow concurrent reviews while the design <br />progresses to the 90 percent level. At the 60 percent completion stage, we will initiate the <br />Department of Ecolory permitting process and develop technical specifications for the project. SCS <br />will conduct weekly design coordination meetings with the Project Team and County. <br />A set of 60 percent (over the shoulder or check set) drawings, technical specifications, and Class 2 (- <br />t5%, +2O%) level cost will be prepared. SCS will meet with the County to discuss comments which <br />will be incorporated and the Project Team will proceed to developing a 90 percent set of drawings <br />and specifications (Standard conditions and technical). A Class t (-!Oo/o, +t5o/o) level cost will be <br />prepared at the 90 percent complete phase. <br />Deliverablesr 60 percent Complete Drawings (check set) - See Exhibit A for the Drawing List (est. 54 <br />drawings).o 60 percent Complete Technical Specifications.r Class 2 Cost Estimate (-tO%/+2O%).. 90 percent Complete Drawings-See Exhibit A for the Drawing List (est. 1-33 drawings).. 90 percent Complete Specifications (technical and standard conditions).o Class l Cost Estimate. (-tO%/+1-5%).o Weekly Design Coordination Meeting Summaries (est. 12). <br />P rofessional Se rvices Ag reement (r ev . 09 I 24 I 20 I 8) <br />Page 16 of23 <br />a <br />a <br />a <br />a <br />a