Laserfiche WebLink
AIA Document A101® – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by <br />The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, "A101," and “AIA <br />Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 11:07:16 <br />PT on 11/02/2022 under Order No.2114266930 which expires on 01/10/2023, is not for resale, is licensed for one-time use only, and may only <br />be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. <br />User Notes: (1331844453) <br /> <br />3 <br /> <br />[ «X » ] Not later than «forty five » ( «45 » ) calendar days from the date of commencement of the Work. <br /> <br />[ « » ] By the following date: « » <br /> <br />§ 3.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work <br />are to be completed prior to Substantial Completion of the entire Work, the Contractor shall achieve Substantial <br />Completion of such portions by the following dates: <br /> <br />Portion of Work Substantial Completion Date <br /> <br /> <br />§ 3.3.3 If the Contractor fails to achieve Substantial Completion as provided in this Section 3.3, liquidated damages, <br />if any, shall be assessed as set forth in Section 4.5 . <br /> <br />ARTICLE 4 CONTRACT SUM <br />§ 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor’s performance of the <br />Contract. The Contract Sum shall be «one million five hundred seventy-seven thousand four hundred and no dollars <br />» ($ «1,577,400.00 » ), subject to additions and deductions as provided in the Contract Documents. <br /> <br />§ 4.2 Alternates <br />§ 4.2.1 Alternates, if any, included in the Contract Sum: <br /> <br />Item Price <br />Swine and Cattle wash areas, and all <br />required components for a complete <br />installation as shown on drawings labeled <br />as Alternate No. 1. <br />$57,400.00 <br /> <br />§ 4.2.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following <br />execution of this Agreement. Upon acceptance, the Owner shall issue a Modification to this Agreement. N/A <br />(Insert below each alternate and the conditions that must be met for the Owner to accept the alternate.) <br /> <br />Item Price Conditions for Acceptance <br /> <br /> <br />§ 4.3 Allowances, if any, included in the Contract Sum: N/A <br />(Identify each allowance.) <br /> <br />Item Price <br /> <br /> <br />§ 4.4 Unit prices, if any: N/A <br />(Identify the item and state the unit price and quantity limitations, if any, to which the unit price will be applicable.) <br /> <br />Item Units and Limitations Price per Unit ($0.00) <br /> <br /> <br />§ 4.5 Liquidated damages, if any: <br />(Insert terms and conditions for liquidated damages, if any.) <br /> <br />«$250 per calendar day or as modified in the Contract until such time as the Work is substantially complete. » <br /> <br />§ 4.6 Other: <br />(Insert provisions for bonus or other incentives, if any, that might result in a change to the Contract Sum.) <br /> <br />«N/A » <br />