Laserfiche WebLink
November 8, 2022 <br />Emergency Operations Center & Vehicle Storage Facility <br />Kittitas County Search and Rescue <br />PRELIMINARY PROJECT BUDGET <br />Budget Range <br />Estimated Construction Cost <br />Low <br />High <br />Site Work (NOT including public utility infrastructure) <br />$400,000 <br />$650,000 <br />EOC Building 4,845 sf <br />$300 $/sf <br />$1,453,500 <br />$350 $/sf <br />$1,695,750 <br />Vehicle Bays 6,025 sf <br />$175 $/sf <br />$1,054,375 <br />$225 $/sf <br />$1,355,625 <br />Sub Total 10,870 sf <br />$268 $/sf <br />$2,907,875 <br />5341 $/sf <br />53,701,375 <br />Sales Tax @ 8.1% on Construction Costs <br />$235,538 <br />$299,811 <br />Construction Contingency @ 5% <br />$145,394 <br />$185,069 <br />Sub Total <br />$303 $/sf <br />$3,288,807 <br />$385 $/sf <br />$4,186,255 <br />Consultant Services <br />Architectural/Engineering Fees <br />$300,000 <br />$350,000 <br />Electrical Engineering Extra Services, Estimated <br />$15,000 <br />$30,000 <br />Civil Engineering, Estimated <br />$25,000 <br />$50,000 <br />Landscape Architecture, Estimated <br />$3,500 <br />$4,000 <br />Mise. Expenses (Document Printing, Consultant Travel, etc.) <br />$2,500 <br />$5,000 <br />Sub Total <br />$346,000 <br />$439,000 <br />Other Costs <br />Planning Approval Fees (SEPA& Cond. Use) <br />$2,500 <br />$3,000 <br />Plan Review and Building Permit <br />$15,000 <br />$20,000 <br />Water Main & Fire Hydrants Connection Fees <br />$4,000 <br />$6,000 <br />1" Domestic Water Connection Fee <br />$2,000 <br />$3,000 <br />Water Systems Inspections (By City) <br />$750 <br />$750 <br />Natural Gas Connection Fee <br />$0 <br />$0 <br />Pacific Power Connection Fee <br />$12,000 <br />$15,000 <br />Construction Testing (under separate contract) <br />$15,000 <br />$20,000 <br />*Signage <br />$10,000 <br />$15,000 <br />*Furnishings Allowance <br />$35,000 <br />$75,000 <br />*Appliance/Equipment Allowance <br />$5,000 <br />$10.000 <br />*Other (honer Expenses <br />1 11 "" <br />Sub Total <br />5108,750 <br />$182,750 <br />Project Grand Total <br />$3,743,557 <br />$4,808,005 <br />Current Market Contingency n 30'9 <br />$872,363 <br />Project Total w/ Current Market Contingency <br />$4,615,919 <br />$5,918,418 <br />Note: "*" Indicates Owner budgeted Items <br />