Laserfiche WebLink
design of the replacement of Bridge #80181 Cooke <br />Canyon Road over Hiline Canal and Bridge #88212 <br />Faust Road over Town Ditch and authorize the <br />County Engineer to negotiate and execute a Local <br />Agency A & E Professional Services Agreement for <br />the same, CRP 315-22 and 316-22. <br />HANDLING: (2) Originals - Public Works <br />ATTACHMENTS: (3) Resolutions — (1) for KPG Psomas; (1) for DCI <br />Engineering; and (1) for GeoEngineers <br />LEAD STAFF: Joshua Fredrickson, County Engineer <br />