My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES-2022-189
>
Meetings
>
2022
>
10. October
>
2022-10-04 10:00 AM - Commissioners' Agenda
>
RES-2022-189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2022 8:11:26 AM
Creation date
10/11/2022 8:08:53 AM
Metadata
Fields
Template:
Meeting
Date
10/4/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution Amending the 2018 Community Wildfire Protection Plan and to authorize the Chairman's Signature on the Adoption Page with Amendment
Order
6
Placement
Consent Agenda
Row ID
94348
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-E <br />6.6 Limited English Speaker Communication Plan <br />Non-English speakers have been underserved in this <br />area, and the goal is to identify the best <br />communication method to share emergency <br />messages with at-risk groups before and during a <br />disaster. The Kittitas County Sherriff's department <br />translates evacuation and communication messages <br />into Spanish on Facebook, but more proactive <br />messages can be done through KFACC. ln an <br />emergency, messages must inform, educate, and <br />mobilize people to follow public health directives. Messages can be delivered through television, <br />radio, newspaper, bill inserts, flyers, word-of mouth, social and community networks, and other <br />channels. As outreach continues, KFACC plans to develop help facilitate messages for emergency <br />preparedness plan to non-English speakers that would benefit their preferred messaging platform. <br />6.7 Pre-Suppression Plans - Preparing Communities Before the lncident <br />A Pre-Suppression Plan is an intelligence packet that assists incident commanders, operations section <br />chiefs, structural protection specialists, division supervisors, group supervisors, taskforce leaders, and <br />strike team leaders in formulating a plan based on current conditions, forecasted weather conditions, <br />and available resources. The main objectives of the plans, is to have a well thought out strategy <br />based on the conditions and deployment of resources before the fire occurs, because a wildfire will <br />start, regardless of the level of planning preparation. lt should not be thought of as a cookbook of <br />what musf be done, but what could be done.Wildland firefighting and structural protection/defense <br />requires judgment based on many years of actualfirefighting experience, and must be responsive to <br />actual, on the ground conditions. No amount of classroom training or simulations can prepare an <br />individual for the leadership required during large, fast-moving fires, but preparing the available <br />information in ways that can facilitate that leadership is key to effective wildfire response. <br />Pre-suppression plans include maps of resource placements, but these placements should not be <br />thought of as static, as resources must remain mobile and available to go where needed. Resources may <br />be deployed to prepare structures, construct hand lines, or conduct a burn out operation. Once the <br />flaming front engages the edge of the city or structure fires begin to occur and firefighters are actively <br />engaged in firefighting, additional resources will likely need to be pulled from other areas to assist. <br />Community Wildfire Protection Plan 55 September 201 8
The URL can be used to link to this page
Your browser does not support the video tag.