My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES-2022-189
>
Meetings
>
2022
>
10. October
>
2022-10-04 10:00 AM - Commissioners' Agenda
>
RES-2022-189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2022 8:11:26 AM
Creation date
10/11/2022 8:08:53 AM
Metadata
Fields
Template:
Meeting
Date
10/4/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution Amending the 2018 Community Wildfire Protection Plan and to authorize the Chairman's Signature on the Adoption Page with Amendment
Order
6
Placement
Consent Agenda
Row ID
94348
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name Project Type Acres Status Year Location Owner <br />Big Creek <br />Reforestation Pine Planting 148 Complete 2016 Tapash-MTRL-RP TNC <br />Cle Elum Ridge- <br />Morgan Commercial Thinning 245 Complete 2016 Tapash-Cle Elum <br />Ridge TNC <br />South Cle Elum <br />Ridge Replanting <br />Replant 40k Ponderosa <br />Pine in South Cle Elum <br />Ridge Fire Burned area <br />900 Complete 2016 TNC <br />Colockabou 02 U1 Precom mercial Thinning 40 Complete 2016 Tapash DNR <br />Brushy Precommercial Thinning 56 Complete 2016 Tapash DNR <br />New Double High Precommercial Thinning 175 Complete 2016 Tapash DNR <br />Clockum Pocket U2 Precommercial Thinning 13 Complete 2016 Tapash DNR <br />Clockum Pocket U3 Precommercial Thinning 85 Complete 2016 Tapash DNR <br />Bacon Ridge U2A Precommercial Thinning 15 Complete 2016 Tapash DNR <br />Wheelbarrow Precommercial Thinning 76 Complete 2016 Tapash DNR <br />Cle Elum Ridge <br />(Shaft)Commercial Thinning 66 Planned TBD Tapash-Cle Elum <br />Ridge TNC <br />Robinson Units Prescribed Burn 728 Planned TBD Tapash-MTRL-RP WDFW <br />Hutchins Units Prescribed Burn 793 Planned TBD Tapash-MTRL-RP WDFW <br />Taneum, Wild Plum <br />Cedar Creek and <br />Plumback <br />Forest Enhancement 2,810 Planned TBD Tapash-MTRL-RP DNR <br />Taneum Forest Enhancement 507 Planned TBD Tapash-MTRL-RP WDFW <br />Robinson Commercial Thinning 1.099 Planned TBD Tapash-MTRL-RP WDFW <br />Planned:6,003 <br />Completed:1,753 <br />Table 4 <br />State and The Nature Conselancy Fuels Reduction Projects <br />5.5.6 U.S. Forest Service <br />While there are many challenges for the USFS to actively manage the landscape, advancements have <br />been made in the NEPA process to increase scale and pace of treatments. By using cross boundary <br />treatments, state and TNC planning, and coordinating treatments in the MTRL-RP, USFS can use the <br />NEPA process to have a larger impact on landscape. The timeframe of the NEPA in this area is <br />expected to be complete in June 2019. While the NEPA is continuing, several smaller treatments on <br />USFS lands have been completed. <br />Community Wildfire Protection Plan 45 September 2018
The URL can be used to link to this page
Your browser does not support the video tag.