Laserfiche WebLink
Project Name Project Type Acres Status Year Location Owner <br />Big Creek <br />Reforestation Pine Planting 148 Complete 2016 Tapash-MTRL-RP TNC <br />Cle Elum Ridge- <br />Morgan Commercial Thinning 245 Complete 2016 Tapash-Cle Elum <br />Ridge TNC <br />South Cle Elum <br />Ridge Replanting <br />Replant 40k Ponderosa <br />Pine in South Cle Elum <br />Ridge Fire Burned area <br />900 Complete 2016 TNC <br />Colockabou 02 U1 Precom mercial Thinning 40 Complete 2016 Tapash DNR <br />Brushy Precommercial Thinning 56 Complete 2016 Tapash DNR <br />New Double High Precommercial Thinning 175 Complete 2016 Tapash DNR <br />Clockum Pocket U2 Precommercial Thinning 13 Complete 2016 Tapash DNR <br />Clockum Pocket U3 Precommercial Thinning 85 Complete 2016 Tapash DNR <br />Bacon Ridge U2A Precommercial Thinning 15 Complete 2016 Tapash DNR <br />Wheelbarrow Precommercial Thinning 76 Complete 2016 Tapash DNR <br />Cle Elum Ridge <br />(Shaft)Commercial Thinning 66 Planned TBD Tapash-Cle Elum <br />Ridge TNC <br />Robinson Units Prescribed Burn 728 Planned TBD Tapash-MTRL-RP WDFW <br />Hutchins Units Prescribed Burn 793 Planned TBD Tapash-MTRL-RP WDFW <br />Taneum, Wild Plum <br />Cedar Creek and <br />Plumback <br />Forest Enhancement 2,810 Planned TBD Tapash-MTRL-RP DNR <br />Taneum Forest Enhancement 507 Planned TBD Tapash-MTRL-RP WDFW <br />Robinson Commercial Thinning 1.099 Planned TBD Tapash-MTRL-RP WDFW <br />Planned:6,003 <br />Completed:1,753 <br />Table 4 <br />State and The Nature Conselancy Fuels Reduction Projects <br />5.5.6 U.S. Forest Service <br />While there are many challenges for the USFS to actively manage the landscape, advancements have <br />been made in the NEPA process to increase scale and pace of treatments. By using cross boundary <br />treatments, state and TNC planning, and coordinating treatments in the MTRL-RP, USFS can use the <br />NEPA process to have a larger impact on landscape. The timeframe of the NEPA in this area is <br />expected to be complete in June 2019. While the NEPA is continuing, several smaller treatments on <br />USFS lands have been completed. <br />Community Wildfire Protection Plan 45 September 2018