My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES-2022-172
>
Meetings
>
2022
>
09. September
>
2022-09-06 10:00 AM - Commissioners' Agenda
>
RES-2022-172
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2022 12:20:22 PM
Creation date
9/13/2022 12:20:18 PM
Metadata
Fields
Template:
Meeting
Date
9/6/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Replacement of Bridge No. 80181 on Cooke Canyon Road over the Hiline Canal CRP 315-22
Order
15
Placement
Consent Agenda
Row ID
93293
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date <br />812912022 <br />Project Title <br />Cooke Canyon over Hiline Canal <br />Agency <br />Kittitas County Public Works <br />Right of Way <br />flnigr't of Way Needed <br />n No Relocation ! Relocation Required <br />Z ruo Right of Way Needed <br />* All construction required bY the <br />contract can be accomPlished <br />within the existing ht of way <br />RailroadUtilities <br />All railroad work will be completed prior to the start of <br />the construction contract <br />[lnt the railroad work will be comP <br />- with the construction contract <br />leted in coordination <br />M ruo railroad work requiredn ruo utility work required <br />[Z nt utility work will be completed prior to the start <br />- of the cbnstruction contract <br />f]ntt utility work will be completed <br />- with the construction contract <br />in coordination <br />Description of Utility Relocation or Adjustments and Existing Major Structures lnvolved in the Project <br />Utilities will be required to temporarily relocate prior to the project and then install permanent after the <br />construction Project. <br />FM lnvolvement <br />ls any airpo rt located within 3.2 kilometers (2 miles) of the ect?lYes Etto <br />Remarks <br />This project has been reviewed by the leg of the administration agencY or ag encies, or it's <br />designee, and is not inconsistent with the <br />AgencY <br />n for communitY develoPment. <br />DateoqlaulAA <br />DOT Form 140-101 <br />Revised 0112022 <br />By <br />Previous Editions Obsolete <br />rpers0n <br />Page 3
The URL can be used to link to this page
Your browser does not support the video tag.