My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-08-08-minutes-public-works-study-session
>
Meetings
>
2022
>
09. September
>
2022-09-06 10:00 AM - Commissioners' Agenda
>
2022-08-08-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2022 1:10:45 PM
Creation date
9/1/2022 1:10:04 PM
Metadata
Fields
Template:
Meeting
Date
9/6/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
93293
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROIECTTITLE: <br />BOWERS FIELD AIRPORT- WETLAND ANO STREAM MITIGATION DESIGN PROJECT <br />CLIENT'. <br />KITTITAS <br />COUNTY <br />IOBNUMBER: <br />TBA <br />PRINCIPAL <br />SRPROI <br />FEW <br />PR01 <br />ENGREN <br />CADD <br />ENGR <br />MGR <br />MGR <br />BNGR <br />TRAINING <br />DSGN <br />CLER. <br />TOTAL <br />PROJECT <br />TASK <br />PROIECTTASK <br />$280.00 <br />$224W <br />S16800 <br />$13010 <br />SIM00 <br />SI38W <br />S82.00 <br />HRS <br />COST <br />COST <br />TASK 1-Pmjxl Kno,moenl <br />$12,483.00 <br />1 Postage <br />0 <br />0 <br />4 <br />3 <br />2 <br />0 <br />0 <br />8 <br />S1.140$LgXW <br />3 postage Scapi $d'NUIFE Fa <br />eaM Sc ulut <br />0 <br />1 <br />8 <br />0 <br />0 <br />0 <br />0 <br />9 <br />51,519.00 <br />3 Pmvidc <br />0 <br />0 <br />1 <br />0 <br />0 <br />n <br />1 <br />1 <br />$250.00 <br />ost rnmehinlsfar IF <br />4 ProComweom,Figualiinfg months) <br />p <br />0 <br />0 <br />0 <br />0 <br />24 <br />$4032W <br />S COUrtli <br />Sehoete aM Subs <br />0 <br />0 <br />8 <br />8 <br />4 <br />d <br />n <br />0 <br />0 <br />12 <br />5$864.00 <br />6 PraviMP jecl SCFastromete <br />Pr <br />0 <br />0 <br />1 <br />0 <br />0 <br />0 <br />2 <br />unNSNelcMs for Design <br />O PrequFAA <br />0 <br />0 <br />4 <br />2 <br />0 <br />1 <br />1 <br />1.0200 <br />$1.62.00 <br />FAAGremA <br />GrGram mons <br />p <br />0 <br />0 <br />0 <br />6 <br />0 <br />0 <br />0 <br />6 <br />6 <br />$]80.00 <br />9 Formi I <br />9 Prepare FAA Farm <br />0 <br />0 <br />1 <br />2 <br />0 <br />0 <br />3 <br />S42800 <br />lO Pmpyc Amwalvtl Quarterly Rerena <br />Qua <br />0 <br />0 <br />0 <br />6 <br />0 <br />0 <br />0 <br />6 <br />SMANO <br />11 P<rform DBE report,0 <br />0 <br />0 <br />J <br />0 <br />0 0 <br />0 <br />l <br />$390S19U.00 <br />TASK 2 -Suri, & Base Ma, Set Up <br />1 Topageopbical Survey Servires <br />See, Sub-Comullma <br />Feebelow <br />"W.00 <br />2 Bax Map Set Up <br />0 <br />0 <br />0 <br />1 <br />0 <br />2 <br />0 <br />3 <br />54060, <br />TASK 3 -Agee, CmNi rition Related to IARPA Submittal <br />$2.548.00 <br />I Site Visit AgeMa, erN Mceting Mitmte <br />p <br />0 <br />8 <br />8 <br />11 <br />0 <br />2 <br />18 <br />$2,54800 <br />TASK 4Lrircal Area Repan U,nK <br />$0,A) <br />1 Cntiwl Ago, Repon Update <br />See Sub-Comullo <br />nl Fces below <br />TASK 5 -Mitigation Plan <br />San <br />1 Mitigation Plan <br />LOttwllam Fasbeoro <br />TASK6-Poilimiwy (60%Ard 911%) Design <br />1 site visit <br />0 <br />0 <br />8 <br />8 <br />0 <br />0 <br />0 <br />16 <br />$2,38410 <br />$49,840W <br />2 Perform Merged Po gs Elemen6 <br />0 <br />p <br />4 <br />24 <br />0 <br />4 <br />0 <br />32 <br />$4344up <br />3 Preptc 60% bibelots Documents eM SpUes <br />0 <br />2 <br />32 <br />0 <br />0 <br />11 <br />4 <br />38 <br />$6,15210 <br />4 Prepare 0% Cost Fusion, <br />0 <br />1 <br />4 <br />8 <br />II <br />2 <br />0 <br />IS <br />S2,212W <br />5 Prepare 60% Comlrvclion Plum <br />0 <br />1 <br />8 <br />16 <br />11 <br />34 <br />1 <br />No <br />$7,04200 <br />660%Review Mceting <br />0 <br />0 <br />4 <br />8 <br />0 <br />0 <br />0 <br />12 <br />SI,11200 <br />I WDES SWPPP Ferr it <br />0 <br />0 <br />4 <br />8 <br />11 <br />2 <br />1 <br />15 <br />53170.00 <br />8 Pigpen Frtbmiwry CSPP <br />0 <br />1 <br />4 <br />% <br />0 <br />1' <br />0 <br />14 <br />S207400 <br />9 Exports 90%Bid ng Wcumenls aN Sons <br />0 <br />1 <br />2. <br />0 <br />0 <br />0 <br />0 <br />21 <br />S3.584W <br />10 Prepare 90%Cog piping <br />11 <br />1 <br />8 <br />16 <br />0 <br />0 <br />0 <br />25 <br />S364800 <br />11 Propose, 90% Cottonton Plems <br />0 <br />1 <br />12 <br />16 <br />16 <br />16 <br />2 <br />63 <br />583%. <br />12 Provide 5 Sets of60% atW 906 Rc,icw Documems <br />11 <br />0 <br />0 <br />4 <br />0 <br />0 <br />8 <br />13 <br />$1,176.W <br />13 Prepare %% FAA Engireees Design Repot <br />II <br />1 <br />8 <br />12 <br />0 <br />0 <br />1 <br />22 <br />$3,210M <br />14 Submit NM/a Das <br />0 <br />0 <br />0 <br />2 <br />0 <br />0 <br />2 <br />4 <br />U24W <br />1590%Review Ageu, <br />0 <br />0 <br />4 <br />6 <br />0 <br />0 <br />0 <br />10 <br />$IA52W <br />TASK 7 -Fit. Design <br />I Rommod W Caunty Ptelimirmy Design Comorms <br />0 <br />0 <br />2 <br />4 <br />0 <br />0 <br />0 <br />6 <br />$856. <br />S13,140W <br />2 Rgpond to Non -FAA PNimirery Daign Connors <br />0 <br />0 <br />2 <br />4 <br />0 <br />0 <br />II <br />6 <br />$856. <br />3 Premium Fit. CSPP <br />0 <br />1 <br />2 <br />3 <br />n <br />1 <br />0 <br />7 <br />$$08800 <br />4 Prepare Fiml Commuclion Plates <br />0 <br />2 <br />6 <br />8 <br />0 <br />10 <br />0 <br />M <br />$3,826.00 <br />5 Prepare Pin Bilk, Doineub on Spcs <br />0 <br />2 <br />16 <br />0 <br />0 <br />II <br />4 <br />22 <br />$346400 <br />6 Prelpm Food Cost E9ima¢ <br />0 <br />0 <br />2 <br />4 <br />0 <br />0 <br />0 <br />6 <br />$85600 <br />9 Submiml Firel Comlmems. Documcn6 <br />0 <br />0 <br />0 <br />1 <br />0 <br />0 <br />1 <br />2 <br />S212W <br />8 FAA Gmnt Closeout <br />0 <br />n <br />4 <br />8 <br />0 <br />1 <br />1 <br />14 <br />$1,93200 <br />TASK 7 -BN Sees <br />1 Uplool Bi lding Documents <br />n <br />0 <br />0 <br />2 <br />0 <br />0 <br />0 <br />2 <br />S3b1.n <br />SAM W <br />2 Pmvitle Airmiscmem for Bidders <br />0 <br />n <br />1 <br />0 <br />u <br />0 <br />1 <br />2 <br />SMOG <br />3 Coighomion Dunn, Bidding <br />0 <br />0 <br />4 <br />0 <br />0 <br />0 <br />4 <br />8 <br />SLIM 00 <br />4 Respoul to BNders Congo. <br />0 <br />0 <br />2 <br />4 <br />0 <br />0 <br />0 <br />6 <br />$856. <br />5 Prepare AddtMa As Naticd <br />0 <br />0 <br />2 <br />3 <br />0 <br />0 <br />0 <br />5 <br />$726,00 <br />6Pro-Bid Cents— <br />0 <br />0 <br />8 <br />10 <br />0 <br />0 <br />n <br />19 <br />$2,644W <br />7 Proper, Bid Tabulation <br />A <br />0 <br />1 <br />1 <br />0 <br />0 <br />1 <br />3 <br />$ <br />Labor SWwul <br />0 <br />IS <br />231 <br />223 <br />18 <br />64 <br />35 <br />586 <br />SIN.732.00 <br />EXPENSES'. <br />Cost <br />Air <br />Grow <br />RT. <br />T2vtl: <br />Per Urm <br />Tips <br />To, <br />Days <br />Miles Markup <br />Lodging <br />SO .W <br />0 <br />1.0 <br />$0.00 <br />RrnUI Carmen Mdome <br />$0.585 <br />5 <br />140 <br />LO <br />540450 <br />Aid— <br />SQW <br />0 <br />II <br />IA <br />$u.. <br />MnH <br />$3000 <br />5 <br />10 <br />SIMM <br />Mia, espeucs'. <br />MISC <br />SO Our <br />PHOTO COPIES <br />S75 W <br />POSTAGE <br />$122.50 <br />PRIMING <br />$75. <br />PLOTTING <br />Sg000 <br />FIELD SUPPLIES <br />5000 <br />SubComulmnts: <br />1. Topagmpbie Survcy Subcomphom, <br />$5,733T. <br />10 <br />$5,73100 <br />2. WrilaM SWissisl Sureomulum <br />$7012300 <br />1.0 <br />$70.12300 <br />Suite.] -Sept., <br />S912W <br />Strong - Suberrommoss <br />$75,KMou <br />Ton- <br />$161.500 C0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.