My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES-2022-162
>
Meetings
>
2022
>
08. August
>
2022-08-16 10:00 AM - Commissioners' Agenda
>
RES-2022-162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2022 11:08:02 AM
Creation date
8/22/2022 11:07:36 AM
Metadata
Fields
Template:
Meeting
Date
8/16/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution for an Amended 2022 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Roslyn
Order
7
Placement
Consent Agenda
Row ID
92653
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parcnlent 3ufJco <br />F ow spr(ndcr {gra?cl}f:l!or stnp <br />t'nrr latsorl <br />lr,t d Slcpos 15'{, <br />SeCtiOn A-A corocro'circh {iyrr.) <br />FICURE 2: VEGETATED FILTER STRIF <br />Various factors were considered in identifying feasible locations for the biofiltration swales. lt is <br />preferred to locate biofiltration swales adjacent to paved roads and within the public right-of-way. <br />To be considerate of the historical context of the City, buildings contributing to the historical <br />district were added to the inventory of data. Biofiltration facilities were located away from these <br />buildings to the maximum extent feasible. \Mere a location is ideal due to site topography, <br />proximity to existing storm sewer and estimated runoff from the water quality storm, biofiltration <br />facilities may be located adjacent to those historical buildings to maximize slormwater treatment <br />benefit (such as on East Washington Avenue). Biofiltration facilities were also located at least 300 <br />feet from wetlands according to City Policy H2.5. Lastly, bioliltration swales were prioritized in <br />subbasins that were 1.5 acres or larger and produced at least 0.1 cubic feet per second of runoff <br />during the water quality storm event. These subbasins are presented as High Priority lor <br />Treatment Subbasins in Exhibit 3. <br />The various site constraints and locations of the proposed biofiltration swales are shown on <br />Exhibit 3. Wthin the CIP I Treatment Assessment Area, biofiltration swales are proposed along <br />North First Street, North A Street, East Washington Avenue, and East Pennsylvania Avenue. <br />Within the remainder of the Treatment Assessment Area, biofiltration swales are proposed along <br />North Sixth Street, West Third Street, Second Street, South First Street, and portions of West <br />Nevada Avenue, West Utah Avenue, West Arizona Avenue, Dakota Avenue, and West Montana <br />Avenue. These biofiltration swales will be shallow and willhave overflow risers as well as <br />underdrains that will connect into the existing storm sewer netwo*. <br />For the unsewered areas of the City south of Califomia Avenue, vegetated filter strips may be <br />located adjacent to roadways where compatible with street slopes and adjacent land uses. These <br />would provide runoff treatment benefits that have not yet been quantified or mapped with this <br />study, This is a general recommendation for this area of town or other parts of the City where <br />biofiltration is deemed not viable. <br />7
The URL can be used to link to this page
Your browser does not support the video tag.